Ozturk, CemalettinTunali S.Hnich B.Örnek, Mustafa Arslan2023-06-162023-06-1620101571-0653https://doi.org/10.1016/j.endm.2010.05.009https://hdl.handle.net/20.500.14365/3443We consider Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times (SBSFMMAL-SDST). We propose alternate Mixed Integer Programming (MIP) and Constraint Programming (CP) formulations. Our experiments show that while the MIP models could not solve relatively small instances, the CP approach seems more promising. © 2010.eninfo:eu-repo/semantics/closedAccessBalancingConstraint ProgrammingMixed Integer ProgrammingMixed Model Assembly LinesSchedulingSequencingSimultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Sequence-Dependent Setup TimesArticle10.1016/j.endm.2010.05.0092-s2.0-77954920614