Issue Date | Title | Author(s) |
2010 | Assignment of Transit Container Bookings for a Transit Agency | Örnek, Mustafa Arslan ; Eliiyi Türsel, Deniz ; Sargut Z.; Ozturk, Cemalettin |
2013 | Balancing and Scheduling of Flexible Mixed Model Assembly Lines | Ozturk, Cemalettin; Tunali, Semra ; Hnich B.; Örnek, Mustafa Arslan |
2013 | Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Parallel Stations | Ozturk, Cemalettin; Tunali, Semra ; Hnich B.; Örnek, Mustafa Arslan |
2010 | Capacitated Lot Sizing With Linked Lots for General Product Structures in Job Shops | Ozturk, Cemalettin; Örnek, Mustafa Arslan |
2012 | A Constraint Programming Model for Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Parallel Stations | Ozturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan |
2013 | Cyclic Scheduling of Flexible Mixed Model Assembly Lines | Ozturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan |
2015 | Cyclic Scheduling of Flexible Mixed Model Assembly Lines With Parallel Stations | Ozturk, Cemalettin; Tunali, Semra ; Hnich B.; Örnek, Mustafa Arslan |
2015 | Integer Programming Model Formulations for Over Constrained Flight - Gate Assignment Problem | Ozturk, Cemalettin; Örnek, Mustafa Arslan ; Sugut I. |
2012 | A Mip Based Heuristic for Capacitated Mrp Systems | Ozturk, Cemalettin; Örnek, Mustafa Arslan |
2014 | A Mixed Integer Programming Model for Multi-Period Dyeing and Batching Problem in a Yarn Plant | Ozturk, Cemalettin; Örnek, Mustafa Arslan |
2010 | A Note on A Mixed Integer Programming Model for Advanced Planning and Scheduling (aps) | Örnek, Mustafa Arslan ; Özpeynirci, Selin ; Ozturk, Cemalettin |
2014 | Operational Extended Model Formulations for Advanced Planning and Scheduling Systems | Ozturk, Cemalettin; Örnek, Mustafa Arslan |
2016 | Optimisation and Constraint Based Heuristic Methods for Advanced Planning and Scheduling Systems | Ozturk, Cemalettin; Örnek, Mustafa Arslan |
2010 | Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Sequence Dependent Task Time Increments | Ozturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan |
2010 | Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Sequence-Dependent Setup Times | Ozturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan |