Fix-And Heuristics for Capacitated Lot Sizing With Setup Carryover and Backordering
| dc.contributor.author | Goren, Hacer Guner | |
| dc.contributor.author | Tunali, Semra | |
| dc.date.accessioned | 2023-06-16T14:25:15Z | |
| dc.date.available | 2023-06-16T14:25:15Z | |
| dc.date.issued | 2018 | |
| dc.description.abstract | Purpose The capacitated lot sizing problem (CLSP) is one of the most important production planning problems which has been widely studied in lot sizing literature. The CLSP is the extension of the Wagner-Whitin problem where there is one product and no capacity constraints. The CLSP involves determining lot sizes for multiple products on a single machine with limited capacity that may change for each planning period. Determining the right lot sizes has a critical importance on the productivity and success of organizations. The paper aims to discuss these issues. Design/methodology/approach This study focuses on the CLSP with setup carryover and backordering. The literature focusing on this problem is rather limited. To fill this gap, a number of problem-specific heuristics have been integrated with fix-and-optimize (FOPT) heuristic in this study. The authors have compared the performances of the proposed approaches to that of the commercial solver and recent results in literature. The obtained results have stated that the proposed approaches are efficient in solving this problem. Findings The computational experiments have shown that the proposed approaches are efficient in solving this problem. Originality/value To address the solution of the CLSP with setup carryover and backordering, a number of heuristic approaches consisting of FOPT heuristic are proposed in this paper. | en_US |
| dc.identifier.doi | 10.1108/JEIM-01-2017-0017 | |
| dc.identifier.issn | 1741-0398 | |
| dc.identifier.issn | 1758-7409 | |
| dc.identifier.uri | https://doi.org/10.1108/JEIM-01-2017-0017 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14365/1901 | |
| dc.language.iso | en | en_US |
| dc.publisher | Emerald Group Publishing Ltd | en_US |
| dc.relation.ispartof | Journal of Enterprıse Informatıon Management | en_US |
| dc.rights | info:eu-repo/semantics/closedAccess | en_US |
| dc.subject | Heuristic approaches | en_US |
| dc.subject | Production planning | en_US |
| dc.subject | Backordering | en_US |
| dc.subject | Capacitated lot sizing problem | en_US |
| dc.subject | Setup carryover | en_US |
| dc.title | Fix-And Heuristics for Capacitated Lot Sizing With Setup Carryover and Backordering | en_US |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.id | Goren, Hacer HGG Guner/0000-0003-0297-7571 | |
| gdc.author.wosid | tunali, semra/AAM-5058-2021 | |
| gdc.author.wosid | Goren, Hacer HGG Guner/R-1041-2018 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C5 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | metadata only access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | İzmir Ekonomi Üniversitesi | en_US |
| gdc.description.departmenttemp | [Goren, Hacer Guner] Pamukkale Univ, Dept Ind Engn, Denizli, Turkey; [Tunali, Semra] Izmir Univ Econ, Izmir, Turkey | en_US |
| gdc.description.endpage | 890 | en_US |
| gdc.description.issue | 6 | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q1 | |
| gdc.description.startpage | 879 | en_US |
| gdc.description.volume | 31 | en_US |
| gdc.description.wosquality | Q1 | |
| gdc.identifier.openalex | W2892155102 | |
| gdc.identifier.wos | WOS:000446849100005 | |
| gdc.index.type | WoS | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 2.0 | |
| gdc.oaire.influence | 2.8179261E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | Heuristic approaches | |
| gdc.oaire.keywords | Setup carryover | |
| gdc.oaire.keywords | Production planning | |
| gdc.oaire.keywords | 650 | |
| gdc.oaire.keywords | Backordering | |
| gdc.oaire.keywords | Capacitated lot sizing problem | |
| gdc.oaire.popularity | 4.4402393E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 0202 electrical engineering, electronic engineering, information engineering | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 1.2936 | |
| gdc.openalex.normalizedpercentile | 0.84 | |
| gdc.opencitations.count | 5 | |
| gdc.plumx.crossrefcites | 5 | |
| gdc.plumx.mendeley | 8 | |
| gdc.plumx.scopuscites | 5 | |
| gdc.virtual.author | Tunalı, Semra | |
| gdc.wos.citedcount | 4 | |
| relation.isAuthorOfPublication | e53c0447-6e83-45f5-91d8-87bff8b0ed82 | |
| relation.isAuthorOfPublication.latestForDiscovery | e53c0447-6e83-45f5-91d8-87bff8b0ed82 | |
| relation.isOrgUnitOfPublication | 7946402e-adc8-4c62-ac59-fbb13820ac91 | |
| relation.isOrgUnitOfPublication | d61c5ef4-1ebc-4355-bc4f-dfa76978271b | |
| relation.isOrgUnitOfPublication | e9e77e3e-bc94-40a7-9b24-b807b2cd0319 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 7946402e-adc8-4c62-ac59-fbb13820ac91 |
Files
Original bundle
1 - 1 of 1
