Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/1122
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOzturk, Cemalettin-
dc.contributor.authorÖrnek, Mustafa Arslan-
dc.date.accessioned2023-06-16T12:59:04Z-
dc.date.available2023-06-16T12:59:04Z-
dc.date.issued2010-
dc.identifier.issn0360-8352-
dc.identifier.issn1879-0550-
dc.identifier.urihttps://doi.org/10.1016/j.cie.2009.10.002-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/1122-
dc.description.abstractIn this paper, we propose a mixed integer programming (MIP) model for a multi-level multi resource capacitated lot sizing and scheduling problem with a set of constraints to track dependent demand balances, that is, the amount left over after allocating the available inventory to the dependent demands. A part of this leftover amount may be kept as a reservation quantity to meet dependent demands of the following period under capacity restrictions. These constraints are necessary because we assume independent demands as well as dependent demands for all items in the product structure. They also are used to tighten the domain of on hand and backorder inventory levels. Although we allow backorders for independent demands only, this is not possible for dependent demands as backorders will disturb the whole demand balance of the product structure. Determination of setup costs is a crucial task when developing lot sizing and scheduling models, especially in a capacitated manufacturing environment with backorders. In this respect, the capacitated lot sizing with linked lot sizes (CLSPL) model we formulate needs not to consider setup costs to avoid unnecessary setups thanks to the new set of constraints, and to obtain feasible lot sizes and schedules. Finally, a numerical example and computational results in a job shop environment are also given, and future research directions are provided. (C) 2009 Elsevier Ltd. All rights reserved.en_US
dc.language.isoenen_US
dc.publisherPergamon-Elsevier Science Ltden_US
dc.relation.ispartofComputers & Industrıal Engıneerıngen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectLot sizingen_US
dc.subjectSetup carryoveren_US
dc.subjectLinked setupsen_US
dc.subjectMIPen_US
dc.subjectJob shopsen_US
dc.subjectFrameworken_US
dc.subjectCarryoveren_US
dc.titleCapacitated lot sizing with linked lots for general product structures in job shopsen_US
dc.typeArticleen_US
dc.identifier.doi10.1016/j.cie.2009.10.002-
dc.identifier.scopus2-s2.0-72049116023en_US
dc.departmentİzmir Ekonomi Üniversitesien_US
dc.authoridOrnek, M Arslan/0000-0002-8612-5183-
dc.authoridOzturk, Cemalettin/0000-0001-5190-9319-
dc.authorwosidOrnek, M Arslan/A-5643-2009-
dc.authorscopusid35093153800-
dc.authorscopusid55926629500-
dc.identifier.volume58en_US
dc.identifier.issue1en_US
dc.identifier.startpage151en_US
dc.identifier.endpage164en_US
dc.identifier.wosWOS:000274767500017en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityQ1-
item.openairetypeArticle-
item.grantfulltextreserved-
item.cerifentitytypePublications-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.languageiso639-1en-
item.fulltextWith Fulltext-
crisitem.author.dept05.09. Industrial Engineering-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Files in This Item:
File SizeFormat 
136.pdf
  Restricted Access
1.09 MBAdobe PDFView/Open    Request a copy
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

21
checked on Sep 18, 2024

WEB OF SCIENCETM
Citations

17
checked on Sep 18, 2024

Page view(s)

52
checked on Aug 19, 2024

Download(s)

6
checked on Aug 19, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.