Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/1237
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Laribi, Imane | - |
dc.contributor.author | Yalaoui, Farouk | - |
dc.contributor.author | Belkaid, Faycal | - |
dc.contributor.author | Sari, Zaki | - |
dc.date.accessioned | 2023-06-16T12:59:31Z | - |
dc.date.available | 2023-06-16T12:59:31Z | - |
dc.date.issued | 2016 | - |
dc.identifier.issn | 2405-8963 | - |
dc.identifier.uri | https://doi.org/10.1016/j.ifacol.2016.07.780 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.14365/1237 | - |
dc.description | 8th IFAC Conference on Manufacturing Modelling, Management and Control (MIM) -- JUN 28-30, 2016 -- Troyes, FRANCE | en_US |
dc.description.abstract | Most of traditional scheduling problems deal with machine as the only resource however, other resources such as raw materials is often disregards. Considering the second resource makes scheduling problems more realistic and practical to implement in manufacturing industries. Due to the applicability of flow shop environment in different manufacturing, scheduling of these types of shops are extensively studied by several authors. However, introducing an additional resource in this environment is not well studied. The present work deals with makespan minimization in flow shop scheduling problems where no renewable resources constraints are considered. The paper illustrates the importance of Johnson (1954) algorithm for the two machine flow shop tinder resources constraints. A mathematical model is also presented. Then a well-know heuristic is adapted to propose fast solution for the m machines flow shop problem subject to resource constraint. (C) 2016, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved. | en_US |
dc.description.sponsorship | Int Federat Automat Control, Tech Comm 5 2 Mfg Modelling Management & Control,Int Federat Automat Control Tech Comm 1 3 Discrete Event & Hybrid Syst,Int Federat Automat Control Tech Comm 3 2 Computat Intelligence Control,Int Federat Automat Control Tech Comm 4 3 Robot,Int Federat Automat Control Tech Comm 5 1 Mfg Plant Control,Int Federat Automat Control Tech Comm 5 3 Enterprise Integrat & Networking,Int Federat Automat Control Tech Comm 5 4 Large Scale Complex Syst,Int Federat Automat Control Tech Comm 7 4 Transporat Syst,Int Federat Automat Control Tech Comm 9 1 Econ, Business, & Financial Syst,Inst Elect & Elect Engineers, France Sect,Int Federat Operat Res Soc,Int Ind Engineers,Int Federat Informat Proc,Inst Operat Res & Management Sci,Soc Modeling & Simulat Int,French Operat Res & Decis Aid Soc,Soc Electricite Electronique TIC,CNRS GdR MACS,CNRS GdR RO | en_US |
dc.language.iso | en | en_US |
dc.publisher | Elsevier Science Bv | en_US |
dc.relation.ispartof | Ifac Papersonlıne | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | Scheduling | en_US |
dc.subject | flow shop | en_US |
dc.subject | heuristics | en_US |
dc.subject | no renewable resource | en_US |
dc.subject | makespatt | en_US |
dc.subject | Financial Constraints | en_US |
dc.subject | Sequencing Problem | en_US |
dc.title | Heuristics for solving flow shop scheduling problem under resources constraints | en_US |
dc.type | Conference Object | en_US |
dc.identifier.doi | 10.1016/j.ifacol.2016.07.780 | - |
dc.identifier.scopus | 2-s2.0-84992425410 | en_US |
dc.department | İzmir Ekonomi Üniversitesi | en_US |
dc.authorid | Laribi, Imane/0000-0002-1100-7748 | - |
dc.authorid | BELKAID, Fayçal/0000-0003-3531-3931 | - |
dc.authorid | SARI, ZAKI/0000-0003-2338-4193 | - |
dc.authorwosid | BELKAID, Fayçal/E-8045-2013 | - |
dc.authorwosid | Laribi, Imane/GWQ-5188-2022 | - |
dc.authorwosid | SARI, ZAKI/E-8040-2013 | - |
dc.authorwosid | BELKAID, Fayçal/S-3934-2019 | - |
dc.authorscopusid | 57191666124 | - |
dc.authorscopusid | 6507073882 | - |
dc.authorscopusid | 55375993800 | - |
dc.authorscopusid | 22954822200 | - |
dc.identifier.volume | 49 | en_US |
dc.identifier.issue | 12 | en_US |
dc.identifier.startpage | 1478 | en_US |
dc.identifier.endpage | 1483 | en_US |
dc.identifier.wos | WOS:000383468400253 | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopusquality | Q3 | - |
item.grantfulltext | open | - |
item.openairetype | Conference Object | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.fulltext | With Fulltext | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
Appears in Collections: | Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
CORE Recommender
SCOPUSTM
Citations
14
checked on Nov 20, 2024
WEB OF SCIENCETM
Citations
11
checked on Nov 20, 2024
Page view(s)
48
checked on Nov 18, 2024
Download(s)
32
checked on Nov 18, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.