Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/1247
Title: Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times
Authors: Rossi, Roberto
Tarim, S. Armagan
Hnich, Brahim
Prestwich, Steven
Keywords: Inventory control
Demand uncertainty
Supplier lead-time uncertainty
Stochastic constraint programming
Global chance-constraints
Lot-Sizing Problem
Constraint
Systems
Model
Publisher: Elsevier
Abstract: In this paper we address the general multi-period production/inventory problem with non-stationary stochastic demand and supplier lead-time under service level constraints. A replenishment cycle policy (RS) is modeled, where R is the nth replenishment cycle length and S is the respective order-up-to-level. We propose a stochastic constraint programming approach for computing the optimal policy parameters. In order to do so, a dedicated global chance-constraint and the respective filtering algorithm that enforce the required service level are presented. Our numerical examples show that a stochastic supplier lead-time significantly affects policy parameters with respect to the case in which the lead-time is assumed to be deterministic or absent. (C) 2010 Elsevier B.V. All rights reserved.
URI: https://doi.org/10.1016/j.ijpe.2010.05.011
https://hdl.handle.net/20.500.14365/1247
ISSN: 0925-5273
1873-7579
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Files in This Item:
File SizeFormat 
273.pdf349.34 kBAdobe PDFView/Open
Show full item record



CORE Recommender

SCOPUSTM   
Citations

32
checked on Sep 25, 2024

WEB OF SCIENCETM
Citations

26
checked on Sep 25, 2024

Page view(s)

78
checked on Sep 30, 2024

Download(s)

14
checked on Sep 30, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.