Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/1247
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRossi, Roberto-
dc.contributor.authorTarim, S. Armagan-
dc.contributor.authorHnich, Brahim-
dc.contributor.authorPrestwich, Steven-
dc.date.accessioned2023-06-16T12:59:34Z-
dc.date.available2023-06-16T12:59:34Z-
dc.date.issued2010-
dc.identifier.issn0925-5273-
dc.identifier.issn1873-7579-
dc.identifier.urihttps://doi.org/10.1016/j.ijpe.2010.05.011-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/1247-
dc.description.abstractIn this paper we address the general multi-period production/inventory problem with non-stationary stochastic demand and supplier lead-time under service level constraints. A replenishment cycle policy (RS) is modeled, where R is the nth replenishment cycle length and S is the respective order-up-to-level. We propose a stochastic constraint programming approach for computing the optimal policy parameters. In order to do so, a dedicated global chance-constraint and the respective filtering algorithm that enforce the required service level are presented. Our numerical examples show that a stochastic supplier lead-time significantly affects policy parameters with respect to the case in which the lead-time is assumed to be deterministic or absent. (C) 2010 Elsevier B.V. All rights reserved.en_US
dc.description.sponsorshipEuropean Community [244994]; Hacettepe University-BAB; Scientific and Technological Research Council of Turkey (TUBITAK) [SOBAG-108K027]en_US
dc.description.sponsorshipThis author has received funding from the European Community's Seventh Framework Programme (FP7) under grant agreement no 244994 (project VEG-i-TRADE).; This author is supported by Hacettepe University-BAB.; The author is supported by the Scientific and Technological Research Council of Turkey (TUBITAK) under Grant No. SOBAG-108K027en_US
dc.language.isoenen_US
dc.publisherElsevieren_US
dc.relation.ispartofInternational Journal of Production Economicsen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectInventory controlen_US
dc.subjectDemand uncertaintyen_US
dc.subjectSupplier lead-time uncertaintyen_US
dc.subjectStochastic constraint programmingen_US
dc.subjectGlobal chance-constraintsen_US
dc.subjectLot-Sizing Problemen_US
dc.subjectConstrainten_US
dc.subjectSystemsen_US
dc.subjectModelen_US
dc.titleComputing the Non-Stationary Replenishment Cycle Inventory Policy Under Stochastic Supplier Lead-Timesen_US
dc.typeArticleen_US
dc.identifier.doi10.1016/j.ijpe.2010.05.011-
dc.identifier.scopus2-s2.0-77955472084-
dc.departmentİzmir Ekonomi Üniversitesien_US
dc.authoridRossi, Roberto/0000-0001-7247-1010-
dc.authoridTarim, S. Armagan/0000-0001-5601-3968-
dc.authoridHnich, Brahim/0000-0001-8875-8390-
dc.authoridPrestwich, Steven/0000-0002-6218-9158-
dc.authorwosidRossi, Roberto/B-4397-2010-
dc.authorwosidTarim, S. Armagan/B-4414-2010-
dc.authorscopusid35563636800-
dc.authorscopusid6506794189-
dc.authorscopusid6602458958-
dc.authorscopusid7004234709-
dc.identifier.volume127en_US
dc.identifier.issue1en_US
dc.identifier.startpage180en_US
dc.identifier.endpage189en_US
dc.identifier.wosWOS:000281345300018-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityQ1-
dc.identifier.wosqualityQ1-
item.cerifentitytypePublications-
item.openairetypeArticle-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextWith Fulltext-
item.languageiso639-1en-
item.grantfulltextopen-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Files in This Item:
File SizeFormat 
273.pdf349.34 kBAdobe PDFView/Open
Show simple item record



CORE Recommender

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.