Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/1542
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGuenhan, Suat-
dc.contributor.authorArditi, David-
dc.contributor.authorDoyle, Jacqueline-
dc.date.accessioned2023-06-16T14:18:42Z-
dc.date.available2023-06-16T14:18:42Z-
dc.date.issued2007-
dc.identifier.issn1052-3928-
dc.identifier.urihttps://doi.org/10.1061/(ASCE)1052-3928(2007)133:1(67)-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/1542-
dc.description.abstractIncreased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district's projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.en_US
dc.language.isoenen_US
dc.publisherAsce-Amer Soc Civil Engineersen_US
dc.relation.ispartofJournal of Professıonal Issues in Engıneerıng Educatıon And Practıceen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectchange ordersen_US
dc.subjectschoolsen_US
dc.subjectconstruction managementen_US
dc.subjectMechanical Constructionen_US
dc.subjectLabor Efficiencyen_US
dc.subjectImpacten_US
dc.subjectProjectsen_US
dc.titleAvoiding change orders in public school constructionen_US
dc.typeArticleen_US
dc.identifier.doi10.1061/(ASCE)1052-3928(2007)133:1(67)-
dc.identifier.scopus2-s2.0-33845788729en_US
dc.departmentİzmir Ekonomi Üniversitesien_US
dc.authoridArditi, David/0000-0002-1580-324X-
dc.authorwosidArditi, David/AAF-4608-2021-
dc.authorscopusid15750438100-
dc.authorscopusid35614735000-
dc.authorscopusid57196824086-
dc.identifier.volume133en_US
dc.identifier.issue1en_US
dc.identifier.startpage67en_US
dc.identifier.endpage73en_US
dc.identifier.wosWOS:000243201400010en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityN/A-
item.grantfulltextreserved-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
item.openairetypeArticle-
item.fulltextWith Fulltext-
item.languageiso639-1en-
crisitem.author.dept06.04. Interior Architecture and Environmental Design-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Files in This Item:
File SizeFormat 
1542.pdf
  Restricted Access
120.94 kBAdobe PDFView/Open    Request a copy
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

40
checked on Oct 2, 2024

WEB OF SCIENCETM
Citations

30
checked on Oct 2, 2024

Page view(s)

114
checked on Sep 30, 2024

Download(s)

6
checked on Sep 30, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.