Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/3709
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Eliiyi Türsel, Deniz | - |
dc.contributor.author | Gürler S. | - |
dc.date.accessioned | 2023-06-16T15:02:01Z | - |
dc.date.available | 2023-06-16T15:02:01Z | - |
dc.date.issued | 2008 | - |
dc.identifier.issn | 1744-2370 | - |
dc.identifier.uri | https://doi.org/10.1504/IJSOM.2008.018000 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.14365/3709 | - |
dc.description.abstract | In this study, we investigate the Preventive Maintenance (PM) schedules for a system subject to failure. Our concern is to find the optimal intervals between the PM activities. We assume that the operating cost of the system linearly increases dependent on the cumulative failure rate of the system since the last PM. The expected costs of repair and PM are different from one another. The durations of these activities are also different. We assume that the duration of repair is dependent on the cumulative failure rate. Whenever the system reliability reaches the reliability threshold R, an imperfect PM is performed, which leads to a gradual decrease in maintenance intervals. We formulate the problem of finding the maintenance intervals. We provide the optimal solution based on analysis of the problem using the reliability threshold value. Numerical experiment results are provided to observe the effect of parameter changes on the model. © 2008, Inderscience Publishers. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Inderscience Publishers | en_US |
dc.relation.ispartof | International Journal of Services and Operations Management | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Maintenance scheduling | en_US |
dc.subject | Optimisation | en_US |
dc.subject | Reliability | en_US |
dc.title | A Reliability-Driven Preventive Maintenance Scheduling Problem | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.1504/IJSOM.2008.018000 | - |
dc.identifier.scopus | 2-s2.0-43149084373 | - |
dc.authorscopusid | 14521079300 | - |
dc.identifier.volume | 4 | en_US |
dc.identifier.issue | 5 | en_US |
dc.identifier.startpage | 521 | en_US |
dc.identifier.endpage | 531 | en_US |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopusquality | Q4 | - |
dc.identifier.wosquality | N/A | - |
item.openairetype | Article | - |
item.grantfulltext | reserved | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.fulltext | With Fulltext | - |
crisitem.author.dept | 05.09. Industrial Engineering | - |
Appears in Collections: | Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection |
CORE Recommender
Sorry the service is unavailable at the moment. Please try again later.
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.