Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/3968
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOzturk, Cemalettin-
dc.contributor.authorTunali S.-
dc.contributor.authorHnich B.-
dc.contributor.authorÖrnek, Mustafa Arslan-
dc.date.accessioned2023-06-16T15:06:31Z-
dc.date.available2023-06-16T15:06:31Z-
dc.date.issued2010-
dc.identifier.isbn9.78996E+12-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/3968-
dc.description24th Mini EURO Conference on Continuous Optimization and Information-Based Technologies in the Financial Sector, MEC EurOPT 2010 -- 23 June 2010 through 26 June 2010 -- Izmir -- 106702en_US
dc.description.abstractGeneral tendency in mixed model assembly line literature is to separate balancing and model sequencing decisions to different time frames. However, today's competitive market conditions force decision makers to respond quickly to changing demand patterns. Therefore, assembly line balancing and mixed model sequencing problems should be considered together. In this paper, we state the problem structure with sequence dependent task time increments and flexibility in task assignment. Furthermore, we compare the performance of two approaches which are proposed to solve the stated problem by using various problem instances. © Izmir University of Economics, Turkey, 2010.en_US
dc.language.isoenen_US
dc.publisherVilnius Gediminas Technical Universityen_US
dc.relation.ispartof24th Mini EURO Conference on Continuous Optimization and Information-Based Technologies in the Financial Sector, MEC EurOPT 2010en_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectAssembly line balancingen_US
dc.subjectFlexible manufacturingen_US
dc.subjectSchedulingen_US
dc.subjectAssembly machinesen_US
dc.subjectOptimizationen_US
dc.subjectSchedulingen_US
dc.subjectAssembly line balancingen_US
dc.subjectCompetitive marketsen_US
dc.subjectFlexible manufacturingen_US
dc.subjectMixed-model assembly linesen_US
dc.subjectMixed-model sequencingen_US
dc.subjectProblem instancesen_US
dc.subjectProblem structureen_US
dc.subjectSequence-dependenten_US
dc.subjectProblem solvingen_US
dc.titleSimultaneous balancing and scheduling of flexible mixed model assembly lines with sequence dependent task time incrementsen_US
dc.typeConference Objecten_US
dc.identifier.scopus2-s2.0-84905508891en_US
dc.authorscopusid35093153800-
dc.authorscopusid6602458958-
dc.authorscopusid55926629500-
dc.identifier.startpage237en_US
dc.identifier.endpage240en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityN/A-
dc.identifier.wosqualityN/A-
item.grantfulltextreserved-
item.openairetypeConference Object-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextWith Fulltext-
item.languageiso639-1en-
item.cerifentitytypePublications-
crisitem.author.dept03.02. Business Administration-
crisitem.author.dept05.09. Industrial Engineering-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
Files in This Item:
File SizeFormat 
2993.pdf
  Restricted Access
111.29 kBAdobe PDFView/Open    Request a copy
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

2
checked on Nov 20, 2024

Page view(s)

80
checked on Nov 18, 2024

Download(s)

10
checked on Nov 18, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.