Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/3968
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Ozturk, Cemalettin | - |
dc.contributor.author | Tunali S. | - |
dc.contributor.author | Hnich B. | - |
dc.contributor.author | Örnek, Mustafa Arslan | - |
dc.date.accessioned | 2023-06-16T15:06:31Z | - |
dc.date.available | 2023-06-16T15:06:31Z | - |
dc.date.issued | 2010 | - |
dc.identifier.isbn | 9.78996E+12 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.14365/3968 | - |
dc.description | 24th Mini EURO Conference on Continuous Optimization and Information-Based Technologies in the Financial Sector, MEC EurOPT 2010 -- 23 June 2010 through 26 June 2010 -- Izmir -- 106702 | en_US |
dc.description.abstract | General tendency in mixed model assembly line literature is to separate balancing and model sequencing decisions to different time frames. However, today's competitive market conditions force decision makers to respond quickly to changing demand patterns. Therefore, assembly line balancing and mixed model sequencing problems should be considered together. In this paper, we state the problem structure with sequence dependent task time increments and flexibility in task assignment. Furthermore, we compare the performance of two approaches which are proposed to solve the stated problem by using various problem instances. © Izmir University of Economics, Turkey, 2010. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Vilnius Gediminas Technical University | en_US |
dc.relation.ispartof | 24th Mini EURO Conference on Continuous Optimization and Information-Based Technologies in the Financial Sector, MEC EurOPT 2010 | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Assembly line balancing | en_US |
dc.subject | Flexible manufacturing | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Assembly machines | en_US |
dc.subject | Optimization | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Assembly line balancing | en_US |
dc.subject | Competitive markets | en_US |
dc.subject | Flexible manufacturing | en_US |
dc.subject | Mixed-model assembly lines | en_US |
dc.subject | Mixed-model sequencing | en_US |
dc.subject | Problem instances | en_US |
dc.subject | Problem structure | en_US |
dc.subject | Sequence-dependent | en_US |
dc.subject | Problem solving | en_US |
dc.title | Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence dependent task time increments | en_US |
dc.type | Conference Object | en_US |
dc.identifier.scopus | 2-s2.0-84905508891 | en_US |
dc.authorscopusid | 35093153800 | - |
dc.authorscopusid | 6602458958 | - |
dc.authorscopusid | 55926629500 | - |
dc.identifier.startpage | 237 | en_US |
dc.identifier.endpage | 240 | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopusquality | N/A | - |
dc.identifier.wosquality | N/A | - |
item.grantfulltext | reserved | - |
item.openairetype | Conference Object | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.fulltext | With Fulltext | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
crisitem.author.dept | 03.02. Business Administration | - |
crisitem.author.dept | 05.09. Industrial Engineering | - |
Appears in Collections: | Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection |
Files in This Item:
File | Size | Format | |
---|---|---|---|
2993.pdf Restricted Access | 111.29 kB | Adobe PDF | View/Open Request a copy |
CORE Recommender
SCOPUSTM
Citations
2
checked on Nov 20, 2024
Page view(s)
80
checked on Nov 18, 2024
Download(s)
10
checked on Nov 18, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.