Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/3983
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Özpeynirci, Selin | - |
dc.contributor.author | Gökgür, Burak | - |
dc.date.accessioned | 2023-06-16T15:06:33Z | - |
dc.date.available | 2023-06-16T15:06:33Z | - |
dc.date.issued | 2013 | - |
dc.identifier.isbn | 9.7899E+12 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.14365/3983 | - |
dc.description | Inst. Syst. Technol. Inf., Control Commun. (INSTICC) | en_US |
dc.description | 2nd International Conference on Operations Research and Enterprise Systems, ICORES 2013 -- 16 February 2013 through 18 February 2013 -- Barcelona -- 97006 | en_US |
dc.description.abstract | In our problem, there are a number of jobs to be processed on parallel computer numerically controlled machines. Each job requires a set of tools and the required tools must be loaded to process the jobs. The machines have limited tool magazine capacities and the number of tools available in the system is limited due to economic restrictions, which leads to the need for switching tools. We assume that the tool switching time constitutes a significant portion of total processing time and does not depend on the number or type of tools changed. The problem is to assign the jobs and the required tools to machines and determine the schedule so that the makespan is minimized. A mathematical model and a heuristic approach based on the decomposition of the problem are developed. | en_US |
dc.language.iso | en | en_US |
dc.relation.ispartof | ICORES 2013 - Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Flexible manufacturing systems | en_US |
dc.subject | Mathematical modelling | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Tool switching | en_US |
dc.subject | Heuristic approach | en_US |
dc.subject | Makespan | en_US |
dc.subject | Parallel computer | en_US |
dc.subject | Tool magazine | en_US |
dc.subject | Tool switching | en_US |
dc.subject | Total processing time | en_US |
dc.subject | Flexible manufacturing systems | en_US |
dc.subject | Heuristic methods | en_US |
dc.subject | Mathematical models | en_US |
dc.subject | Operations research | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Scheduling algorithms | en_US |
dc.subject | Switching | en_US |
dc.title | Scheduling with tool switching in flexible manufacturing systems | en_US |
dc.type | Conference Object | en_US |
dc.identifier.scopus | 2-s2.0-84877975127 | en_US |
dc.authorscopusid | 25228157500 | - |
dc.identifier.startpage | 326 | en_US |
dc.identifier.endpage | 329 | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopusquality | N/A | - |
dc.identifier.wosquality | N/A | - |
item.grantfulltext | reserved | - |
item.openairetype | Conference Object | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.fulltext | With Fulltext | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
crisitem.author.dept | 05.09. Industrial Engineering | - |
crisitem.author.dept | 05.09. Industrial Engineering | - |
Appears in Collections: | Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection |
Files in This Item:
File | Size | Format | |
---|---|---|---|
3008.pdf Restricted Access | 296.49 kB | Adobe PDF | View/Open Request a copy |
CORE Recommender
Page view(s)
84
checked on Nov 18, 2024
Download(s)
6
checked on Nov 18, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.