Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/5145
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTan, B.-
dc.contributor.authorKarabağ, Oktay-
dc.contributor.authorKhayyati, S.-
dc.date.accessioned2024-01-26T19:42:34Z-
dc.date.available2024-01-26T19:42:34Z-
dc.date.issued2023-
dc.identifier.issn0020-7543-
dc.identifier.urihttps://doi.org/10.1080/00207543.2023.2298488-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/5145-
dc.description.abstractIncreasing energy efficiency in manufacturing has significant environmental and cost benefits. Turning on or off a machine dynamically while considering the production rate requirements can offer substantial energy savings. In this work, we examine the optimal policies to control production and turn on and off a machine that operates in working, idle, off, and warmup modes for the case where demand inter-arrival, production, and warmup times have phase-type distributions. The optimal control problem that minimises the expected costs associated with the energy usage in different energy modes and the inventory and backlog costs is solved using a linear program associated with the underlying Markov Decision Process. We also present a matrix-geometric method to evaluate the steady-state performance of the system under a given threshold control policy. We show that when the inter-arrival time distribution is not exponential, the optimal control policy depends on both the current phase of the inter-arrival time and inventory position. The phase-dependent policy implemented by estimating the current phase based on the time elapsed since the last arrival yields a buffer- and time-based policy to control the energy mode and production. We show that policies that only use the inventory position information can be effective if the control parameters are chosen appropriately. However, the control policies that use both the inventory and time information further improve the performance. © 2023 The Author(s). Published by Informa UK Limited, trading as Taylor & Francis Group.en_US
dc.language.isoenen_US
dc.publisherTaylor and Francis Ltd.en_US
dc.relation.ispartofInternational Journal of Production Researchen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectenergy efficiencyen_US
dc.subjectlinear programmingen_US
dc.subjectmarkovian modelsen_US
dc.subjectOptimal production and energy controlen_US
dc.subjectSDG 12: responsible consumption and productionen_US
dc.subjectswitch-on and -off policyen_US
dc.subjectInformation useen_US
dc.subjectLinear programmingen_US
dc.subjectMarkov processesen_US
dc.subjectOptimal control systemsen_US
dc.subjectProduction controlen_US
dc.subjectInter-arrival timeen_US
dc.subjectLinear-programmingen_US
dc.subjectMarkovian modelen_US
dc.subjectOptimal energyen_US
dc.subjectOptimal productionen_US
dc.subjectOptimal production and energy controlen_US
dc.subjectSDG 12: responsible consumption and productionen_US
dc.subjectSwitch-onen_US
dc.subjectSwitch-on and -off policyen_US
dc.subjectTime baseden_US
dc.subjectEnergy efficiencyen_US
dc.titleEnergy-efficient production control of a make-to-stock system with buffer- and time-based policiesen_US
dc.typeArticleen_US
dc.identifier.doi10.1080/00207543.2023.2298488-
dc.identifier.scopus2-s2.0-85181203731en_US
dc.departmentİzmir Ekonomi Üniversitesien_US
dc.authorscopusid7402833947-
dc.authorscopusid57196390808-
dc.authorscopusid57212755888-
dc.institutionauthor-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
item.grantfulltextopen-
item.openairetypeArticle-
item.languageiso639-1en-
item.fulltextWith Fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
crisitem.author.dept05.09. Industrial Engineering-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
Files in This Item:
File SizeFormat 
5145.pdf4.16 MBAdobe PDFView/Open
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

1
checked on Sep 18, 2024

Page view(s)

70
checked on Aug 19, 2024

Download(s)

20
checked on Aug 19, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.