Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/844
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOzturk, Cemalettin-
dc.contributor.authorTunali, Semra-
dc.contributor.authorHnich B.-
dc.contributor.authorÖrnek, Mustafa Arslan-
dc.date.accessioned2023-06-16T12:47:42Z-
dc.date.available2023-06-16T12:47:42Z-
dc.date.issued2013-
dc.identifier.issn0268-3768-
dc.identifier.issn1433-3015-
dc.identifier.urihttps://doi.org/10.1007/s00170-012-4675-1-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/844-
dc.description.abstractIn this paper, we study flexible mixed model assembly lines with serially connected stages where stages may have one or more parallel stations. Station parallelism in flexible mixed model assembly lines improves system reliability and enables rapid adaptability to customer demand fluctuations. However, in order to effectively manage such lines under real-world conditions, there is a need to extend traditional assembly line management methods. This study extends the current research by simultaneously considering the problems of task assignment and model scheduling on parallel stations. Furthermore, scheduling of assigned tasks on each station is considered. We formulate the problem context first as a mixed integer programming model and then develop a decomposition scheme for large scale applications. Finally, we compare the performance of the proposed model and decomposition scheme using various size test instances.en_US
dc.language.isoenen_US
dc.publisherSpringer London Ltden_US
dc.relation.ispartofInternatıonal Journal of Advanced Manufacturıng Technologyen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectMixed model assembly linesen_US
dc.subjectBalancingen_US
dc.subjectSchedulingen_US
dc.subjectFlexible manufacturingen_US
dc.subjectMixed integer programmingen_US
dc.subjectSystemen_US
dc.subjectAlgorithmsen_US
dc.subjectDesignen_US
dc.titleBalancing and scheduling of flexible mixed model assembly lines with parallel stationsen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s00170-012-4675-1-
dc.identifier.scopus2-s2.0-84891491401en_US
dc.departmentİzmir Ekonomi Üniversitesien_US
dc.authoridOrnek, M Arslan/0000-0002-8612-5183-
dc.authoridHnich, Brahim/0000-0001-8875-8390-
dc.authoridOzturk, Cemalettin/0000-0001-5190-9319-
dc.authorwosidOrnek, M Arslan/A-5643-2009-
dc.authorwosidtunali, semra/AAM-5058-2021-
dc.authorscopusid35093153800-
dc.authorscopusid7004191746-
dc.authorscopusid6602458958-
dc.authorscopusid55926629500-
dc.identifier.volume67en_US
dc.identifier.issue9.Araen_US
dc.identifier.startpage2577en_US
dc.identifier.endpage2591en_US
dc.identifier.wosWOS:000322326300051en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityQ2-
dc.identifier.wosqualityQ2-
item.grantfulltextembargo_20300101-
item.openairetypeArticle-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextWith Fulltext-
item.languageiso639-1en-
item.cerifentitytypePublications-
crisitem.author.dept03.02. Business Administration-
crisitem.author.dept05.09. Industrial Engineering-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Files in This Item:
File SizeFormat 
844.pdf
  Until 2030-01-01
306.86 kBAdobe PDFView/Open    Request a copy
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

23
checked on Nov 20, 2024

WEB OF SCIENCETM
Citations

17
checked on Nov 20, 2024

Page view(s)

110
checked on Nov 18, 2024

Download(s)

6
checked on Nov 18, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.