Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/847
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGokgur, Burak-
dc.contributor.authorGökçe, Mahmut Ali-
dc.contributor.authorÖzpeynirci, Selin-
dc.date.accessioned2023-06-16T12:47:43Z-
dc.date.available2023-06-16T12:47:43Z-
dc.date.issued2015-
dc.identifier.issn0268-3768-
dc.identifier.issn1433-3015-
dc.identifier.urihttps://doi.org/10.1007/s00170-015-7216-x-
dc.identifier.urihttps://hdl.handle.net/20.500.14365/847-
dc.description.abstractDisassembly systems obtain valuable parts from end-of-life products to remanufacture, reuse, or recycle them. This study deals with disassembly scheduling and presents a novel mixed integer programming model. Disassembly scheduling is the problem of determining quantity and schedule of items disassembled, held in inventory, sold, and disposed on capacitated resources over a planning horizon while satisfying at least a given service level. The model presented here includes a number of novelties including assignment of disassembly operations to parallel capacitated resources, consideration of costs to environment and demand for each level of items. We also present a problem testbed to be used for comparison of different algorithms and the generation mechanism. Results from a large experimental design using problem testbed are presented.en_US
dc.language.isoenen_US
dc.publisherSpringer London Ltden_US
dc.relation.ispartofInternatıonal Journal of Advanced Manufacturıng Technologyen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectDisassembly systemsen_US
dc.subjectDisassembly schedulingen_US
dc.subjectMathematical programmingen_US
dc.subjectProducten_US
dc.subjectPartsen_US
dc.titleLarge-scale disassembly operations planning with parallel resourcesen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s00170-015-7216-x-
dc.identifier.scopus2-s2.0-84929692866en_US
dc.departmentİzmir Ekonomi Üniversitesien_US
dc.authoridGökgür, Burak/0000-0001-7384-2856-
dc.authorwosidGökgür, Burak/V-8502-2019-
dc.authorscopusid55735526000-
dc.authorscopusid36484461000-
dc.authorscopusid25228157500-
dc.identifier.volume81en_US
dc.identifier.issue5.Ağuen_US
dc.identifier.startpage1195en_US
dc.identifier.endpage1214en_US
dc.identifier.wosWOS:000363718600043en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityQ2-
dc.identifier.wosqualityQ2-
item.grantfulltextembargo_20300101-
item.openairetypeArticle-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextWith Fulltext-
item.languageiso639-1en-
item.cerifentitytypePublications-
crisitem.author.dept05.09. Industrial Engineering-
crisitem.author.dept05.09. Industrial Engineering-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Files in This Item:
File SizeFormat 
847.pdf
  Until 2030-01-01
864.34 kBAdobe PDFView/Open    Request a copy
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

3
checked on Nov 20, 2024

WEB OF SCIENCETM
Citations

2
checked on Nov 20, 2024

Page view(s)

136
checked on Nov 18, 2024

Download(s)

6
checked on Nov 18, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.