Browsing by Author "Dumlu, E."
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
Conference Object Comparison of the Evolutions of Internal Erosion When Seepage Is at Top, Bottom or Middle Part of the Homogeneous Earth-Fill Dam Built With Fine Sand and Clay Mixture(International Association for Hydro-Environment Engineering and Research (IAHR), 2024) Güney, M.S.; Dumlu, E.; Okan, M.; Kalyoncu, Y.One of the most prominent failure reasons for earth-fill dams is internal erosion resulting from piping. This failure mode may cause irreversible weakened structural integrity, loss of properties, and even loss of lives. Therefore, it is important to understand the breaching process due to piping by providing reliable data for the decision-makers in case of emergency. This study was supported by the Scientific and Technological Research Council of Turkey with project number 119M609 and involves experimental investigation on piping under three different weak zone scenarios to examine the breach process and provide the data for more realistic numerical evaluations. The experiments were conducted in the hydraulic laboratory of Izmir University of Economics and Dokuz Eylul University. The initiation of piping was triggered from seepage in weak layers at the bottom, middle, and upper parts, along the centerline of homogenous earth-fill dams in a rectangular flume. As a result of the experiments, the magnitude of the peak discharges and their durations as well as the eroded breach areas were found to be affected by the locations of the seepage and initial water heads acting on the weak zones. Also, in the experiments, at the beginning of the breaching, initial cascading surface flow resulted in sheet and rill erosion. © 2024 ISHS. All Rights Reserved.Conference Object Citation - WoS: 2Citation - Scopus: 3Experimental Study of the Evolution of the Breach and the Discharge Through the Breach Resulting From Piping Due To Seepage at the Earth-Fill Dam Top(International Association for Hydro-Environment Engineering and Research, 2022) Güney, Mehmet Şükrü; Okan, Merve; Dumlu, E.; Bor Türkben, Aslı; Aklık, Pelin; Tayfur, G.Internal erosion, also known as piping, is one of the most important causes of earth-fill dam breaks. Many researchers dealing with numerical analyses in this area make some simplified assumptions about the shape of the breach and the discharge of water flowing through the breach. This study was conducted in the scope of the project supported financially by the Scientific and Technological Research Council of Turkey and it consists of experimental study which aims to provide data needed to perform numerical analyses with more realistic approaches. A dam with a height of 0.6 m, a bottom width of 2 m and a crest width of 0.20 m was built in a flume 1 m wide, 0.81 m high and 6.14 m long. Before the construction of the dam, some common soil mechanics tests were carried out. The dam was constructed by using a mixture consisting of 85 % sand and 15 % clay. A circular tunnel with a diameter of 2 cm was created along the centerline at 6 cm below the dam crest. In the closed system, water was pumped from the lower reservoir to the upper channel. Six cameras located at different locations recorded the evolution of the dam failure. Gauss Area formula was applied to determine the time-varied of the breach areas at upstream and downstream sides. The discharge of water through the breach and average flow velocity were determined by using the continuity equation. The changes in water depth in the channel were also recorded. © 2022 IAHR.

