| Issue Date | Title | Author(s) |
121 | 2016 | Parallel machine scheduling with tool loading | Özpeynirci, Selin ; Gokgur, Burak ; Hnich, Brahim |
122 | 2018 | Parallel machine scheduling with tool loading: a constraint programming approach | Gokgur, Burak ; Hnich, Brahim; Özpeynirci, Selin |
123 | 2022 | Portfolio decision analysis with a generalized balance approach | Özpeynirci, Selin ; Özpeynirci, Özgür ; Mousseau, Vincent |
124 | 2011 | Production control and stock rationing for a make-to-stock system with parallel production channels | Bulut, Onder; Fadiloglu, Mehmet Murat |
125 | 2010 | Production planning and control at an integrated poultry organization | Gökçe M.A.; Gökgür, Burak ; Elverdi E.; Er E.; Gördesli T. |
126 | 2010 | The Properties of The Weak Subdifferentials | Kasimbeyli̇, Refail ; Inceoglu, Gonca |
127 | 2022 | Quantifying Return and Volatility Spillovers among Major Cryptocurrencies: A VAR-BEKK-GARCH Analysis | Vardar, Gülin ; Tacoglu, Caner ; Aydogan, Berna |
128 | 2009 | Radial epiderivatives and set-valued optimization | Kasimbeyli̇, Refail |
129 | 2023 | A Reinforcement Learning Approach for Improved Photolithography Schedules | Zhang, T.; Kabak, Kamil Erkan ; Heavey, C.; Rose, O. |
130 | 2008 | A reliability-driven preventive maintenance scheduling problem | Eliiyi Türsel, Deniz ; Gürler S. |
131 | 2013 | Sales and returns forecasting for inventory control | Karabağ, Oktay |
132 | 2014 | A scheduling optimization study in an assembly line of a company in Turkey | Şerbetçioğlu, Cemre ; Ari E.; Yetkin Ekren, Banu ; Özpeynirci, Selin |
133 | 2013 | Scheduling with tool switching in flexible manufacturing systems | Özpeynirci, Selin ; Gökgür, Burak |
134 | 2009 | Simulation analysis of lot streaming in job shops with transportation queue disciplines | Edis, Rahime Sancar; Ornek, Arslan |
135 | 2015 | SIMULATION ANALYSIS OF SHUTTLE BASED STORAGE AND RETRIEVAL SYSTEMS | Lerher, T.; Yetkin Ekren, Banu ; Sari, Z.; Rosi, B. |
136 | 2008 | A simulation based experimental design to analyze factors affecting production flow time | Yetkin Ekren, Banu ; Örnek, Mustafa Arslan |
137 | 2015 | SIMULATION-BASED INVENTORY CONTROL IN A CHEMICAL INDUSTRY | Yetkin Ekren, Banu ; Örnek, Mustafa Arslan |
138 | 2008 | Simultaneous allocation of continuous berths and mobile cranes with variable handling times | Eliiyi Türsel, Deniz ; Oezcam, Burcu; Ada, Erhan ; Gueldogan, Evrim; Sevil, Bengue ; Yumurtacı Hüseyinoğlu, Işık Özge |
139 | 2010 | Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence dependent task time increments | Ozturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan |
140 | 2010 | Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times | Ozturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan |