05.09. Industrial Engineering

OrgUnit's Researchers publications
(Dept/Workgroup Publication)

Results 21-40 of 153 (Search time: 0.006 seconds).

Issue DateTitleAuthor(s)
212015Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industryKose, Simge Yelkenci; Demir, Leyla; Tunali, Semra ; Eliiyi Türsel, Deniz 
222012A CASE STUDY TO REDUCE ACCIDENT RATES AND WAITING TIMES AT A SELECTED ROUNDABOUTOner, Erdinc ; Çeli̇k, Burcu ; Isik, Gul
232007The Chlamydomonas genome reveals the evolution of key animal and plant functionsMerchant, Sabeeha S.; Prochnik, Simon E.; Vallon, Olivier; Harris, Elizabeth H.; Karpowicz, Steven J.; Witman, George B.; Terry, Astrid; Allmer, Jens 
242012Combined forecasts in portfolio optimization: A generalized approachUstun, Ozden; Kasimbeyli̇, Refail 
52013A comparison of three search algorithms for solving the buffer allocation problem in reliable production linesDemir L.; Diamantidis A.; Eliiyi Türsel, Deniz ; O'Kelly M.E.J.; Papadopoulos C.T.; Tsadiras A.K.; Tunali S. 
62011Computing efficient solutions of nonconvex multi-objective problems via scalarizationKasimbeyli R. 
72013A conic scalarization method in multi-objective optimizationKasimbeyli̇, Refail 
82012A constraint programming model for balancing and scheduling of flexible mixed model assembly lines with parallel stationsOzturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan 
92013A container storage problem in port operationsÇeli̇k, Burcu 
102016A continuous-review inventory model with disruptions and reorder pointSevgen, Arya 
112013CUMULATIVE INTERARRIVAL TIME DISTRIBUTIONS OF FREEWAY ENTRANCE RAMP TRAFFIC FOR TRAFFIC SIMULATIONSOner, Erdinc 
122013Cyclic scheduling of flexible mixed model assembly linesOzturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan 
132015Cyclic scheduling of flexible mixed model assembly lines with parallel stationsOzturk, Cemalettin; Tunali, Semra ; Hnich B.; Örnek, Mustafa Arslan 
142023A decomposition based minimax regret approach for inverse multiple criteria sorting problemÖzpeynirci, Özgür ; Özpeynirci, Selin ; Mousseau, Vincent
152023Deep Learning Enabling Digital Twin Applications in Production Scheduling: Case of Flexible Job Shop Manufacturing EnvironmentGhasemi, A.; Yeganeh, Y.T.; Matta, A.; Kabak, Kamil Erkan ; Heavey, C.
162020Design and analysis of bi-objective flexible job shop scheduling problem: A case study in construction equipment manufacturing industryResat, Hamdi Giray 
172020Design and Analysis of Novel Hybrid Multi-Objective Optimization Approach for Data-Driven Sustainable Delivery SystemsReşat, Hamdi Giray 
182020Design and development of hybrid forecasting model using artificial neural networks and ARIMA methods for sustainable energy management systems: A case study in tobacco industryResat, Hamdi Giray 
192015Determining optimum (s, S) levels of floor stock items in a paint production environmentYetkin Ekren, Banu ; Örnek, Mustafa Arslan 
202018Different methods to fuzzy X- R control charts used in production Interval type-2 fuzzy set exampleTeksen, Hatice Ercan; Anagun, Ahmet Sermet