Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/2707
Title: Design and analysis of bi-objective flexible job shop scheduling problem: A case study in construction equipment manufacturing industry
Authors: Resat, Hamdi Giray
Keywords: Flexible job-shop scheduling
Mixed-Integer linear programming
Discrete optimization
Genetic Algorithm
Optimization
Publisher: Pamukkale Univ
Abstract: This paper presents a design and development of mixed-integer linear optimization model for scheduling of flexible job-shop production problem under capacity constraints by using exact solution algorithm. Modelling approach is designed in order to introduce data analysis in real situations, minimize production time in production lines, reduce total production costs, and reveal important features of mathematical programming problem in detail. The main purpose of this study is to obtain faster and efficient Pareto solution sets for bi-objective problem by using epsilon-constraint method. Generated Pareto frontier using real life data is shared with decision makers. The GAMS programming language is used during the solution phase of a mixed-integer linear optimization model for bi-objective problem and production efficiency of the company is increased around 16.6% in terms of production cost.
URI: https://doi.org/10.5505/pajes.2019.35033
https://search.trdizin.gov.tr/yayin/detay/388669
https://hdl.handle.net/20.500.14365/2707
ISSN: 1300-7009
2147-5881
Appears in Collections:TR Dizin İndeksli Yayınlar Koleksiyonu / TR Dizin Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Files in This Item:
File SizeFormat 
2707.pdf751.46 kBAdobe PDFView/Open
Show full item record



CORE Recommender

Page view(s)

68
checked on Sep 30, 2024

Download(s)

12
checked on Sep 30, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.