Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/2707
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Resat, Hamdi Giray | - |
dc.date.accessioned | 2023-06-16T14:46:52Z | - |
dc.date.available | 2023-06-16T14:46:52Z | - |
dc.date.issued | 2020 | - |
dc.identifier.issn | 1300-7009 | - |
dc.identifier.issn | 2147-5881 | - |
dc.identifier.uri | https://doi.org/10.5505/pajes.2019.35033 | - |
dc.identifier.uri | https://search.trdizin.gov.tr/yayin/detay/388669 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.14365/2707 | - |
dc.description.abstract | This paper presents a design and development of mixed-integer linear optimization model for scheduling of flexible job-shop production problem under capacity constraints by using exact solution algorithm. Modelling approach is designed in order to introduce data analysis in real situations, minimize production time in production lines, reduce total production costs, and reveal important features of mathematical programming problem in detail. The main purpose of this study is to obtain faster and efficient Pareto solution sets for bi-objective problem by using epsilon-constraint method. Generated Pareto frontier using real life data is shared with decision makers. The GAMS programming language is used during the solution phase of a mixed-integer linear optimization model for bi-objective problem and production efficiency of the company is increased around 16.6% in terms of production cost. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Pamukkale Univ | en_US |
dc.relation.ispartof | Pamukkale Unıversıty Journal of Engıneerıng Scıences-Pamukkale Unıversıtesı Muhendıslık Bılımlerı Dergısı | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | Flexible job-shop scheduling | en_US |
dc.subject | Mixed-Integer linear programming | en_US |
dc.subject | Discrete optimization | en_US |
dc.subject | Genetic Algorithm | en_US |
dc.subject | Optimization | en_US |
dc.title | Design and analysis of bi-objective flexible job shop scheduling problem: A case study in construction equipment manufacturing industry | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.5505/pajes.2019.35033 | - |
dc.department | İzmir Ekonomi Üniversitesi | en_US |
dc.authorid | Resat, Hamdi/0000-0002-9235-3510 | - |
dc.authorwosid | Resat, Hamdi/AAB-5868-2020 | - |
dc.identifier.volume | 26 | en_US |
dc.identifier.issue | 1 | en_US |
dc.identifier.startpage | 150 | en_US |
dc.identifier.endpage | 156 | en_US |
dc.identifier.wos | WOS:000514814600020 | en_US |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.identifier.trdizinid | 388669 | en_US |
dc.identifier.scopusquality | N/A | - |
item.grantfulltext | open | - |
item.openairetype | Article | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.fulltext | With Fulltext | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
crisitem.author.dept | 05.09. Industrial Engineering | - |
Appears in Collections: | TR Dizin İndeksli Yayınlar Koleksiyonu / TR Dizin Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
CORE Recommender
Page view(s)
98
checked on Nov 18, 2024
Download(s)
12
checked on Nov 18, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.