Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/1542
Title: | Avoiding Change Orders in Public School Construction | Authors: | Guenhan, Suat Arditi, David Doyle, Jacqueline |
Keywords: | change orders schools construction management Mechanical Construction Labor Efficiency Impact Projects |
Publisher: | Asce-Amer Soc Civil Engineers | Abstract: | Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district's projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects. | URI: | https://doi.org/10.1061/(ASCE)1052-3928(2007)133:1(67) https://hdl.handle.net/20.500.14365/1542 |
ISSN: | 1052-3928 |
Appears in Collections: | Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
Show full item record
CORE Recommender
SCOPUSTM
Citations
40
checked on Apr 2, 2025
WEB OF SCIENCETM
Citations
32
checked on Apr 2, 2025
Page view(s)
122
checked on Mar 31, 2025
Download(s)
6
checked on Mar 31, 2025
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.