Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14365/2827
Title: | Simultaneous allocation of continuous berths and mobile cranes with variable handling times | Authors: | Eliiyi Türsel, Deniz Oezcam, Burcu Ada, Erhan Gueldogan, Evrim Sevil, Bengue Yumurtacı Hüseyinoğlu, Işık Özge |
Keywords: | berth allocation problem crane allocation problem port of izmir port management non linear programming Container Port Models |
Publisher: | Vilnius Gediminas Technical Univ Press, Technika | Abstract: | Port management is a strategic issue for the developing economies. Its activities directly influence the trade volume of the region where the port is located, increase the investment in the region, and contribute to the overall economic development. There are many activities and decisions to be arranged and managed in a port. In this paper, one of the most important port management activities, Berth Allocation Problem, is studied in detail, to reduce congestion in the port. The contribution of the study is based on simultaneous allocation of continuous berths and mobile cranes. The approach is applied to the Port of Izmir and promising preliminary results of our study are presented. | Description: | 20th International Conference/Euro Mini Conference on Continuous Optimization and Knowledge-Based Technologies (EurOPT 2008) -- MAY 20-23, 2008 -- Neringa, LITHUANIA | URI: | https://hdl.handle.net/20.500.14365/2827 | ISBN: | 978-9955-28-283-9 |
Appears in Collections: | Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
Files in This Item:
File | Size | Format | |
---|---|---|---|
2008.pdf Restricted Access | 432.7 kB | Adobe PDF | View/Open Request a copy |
CORE Recommender
Page view(s)
64
checked on Nov 4, 2024
Download(s)
4
checked on Nov 4, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.