Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/2827
Title: Simultaneous allocation of continuous berths and mobile cranes with variable handling times
Authors: Eliiyi Türsel, Deniz
Oezcam, Burcu
Ada, Erhan
Gueldogan, Evrim
Sevil, Bengue
Yumurtacı Hüseyinoğlu, Işık Özge
Keywords: berth allocation problem
crane allocation problem
port of izmir
port management
non linear programming
Container Port
Models
Publisher: Vilnius Gediminas Technical Univ Press, Technika
Abstract: Port management is a strategic issue for the developing economies. Its activities directly influence the trade volume of the region where the port is located, increase the investment in the region, and contribute to the overall economic development. There are many activities and decisions to be arranged and managed in a port. In this paper, one of the most important port management activities, Berth Allocation Problem, is studied in detail, to reduce congestion in the port. The contribution of the study is based on simultaneous allocation of continuous berths and mobile cranes. The approach is applied to the Port of Izmir and promising preliminary results of our study are presented.
Description: 20th International Conference/Euro Mini Conference on Continuous Optimization and Knowledge-Based Technologies (EurOPT 2008) -- MAY 20-23, 2008 -- Neringa, LITHUANIA
URI: https://hdl.handle.net/20.500.14365/2827
ISBN: 978-9955-28-283-9
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Files in This Item:
File SizeFormat 
2008.pdf
  Restricted Access
432.7 kBAdobe PDFView/Open    Request a copy
Show full item record



CORE Recommender

Page view(s)

64
checked on Nov 18, 2024

Download(s)

4
checked on Nov 18, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.