Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14365/847
Title: Large-Scale Disassembly Operations Planning With Parallel Resources
Authors: Gokgur, Burak
Gökçe, Mahmut Ali
Özpeynirci, Selin
Keywords: Disassembly systems
Disassembly scheduling
Mathematical programming
Product
Parts
Publisher: Springer London Ltd
Abstract: Disassembly systems obtain valuable parts from end-of-life products to remanufacture, reuse, or recycle them. This study deals with disassembly scheduling and presents a novel mixed integer programming model. Disassembly scheduling is the problem of determining quantity and schedule of items disassembled, held in inventory, sold, and disposed on capacitated resources over a planning horizon while satisfying at least a given service level. The model presented here includes a number of novelties including assignment of disassembly operations to parallel capacitated resources, consideration of costs to environment and demand for each level of items. We also present a problem testbed to be used for comparison of different algorithms and the generation mechanism. Results from a large experimental design using problem testbed are presented.
URI: https://doi.org/10.1007/s00170-015-7216-x
https://hdl.handle.net/20.500.14365/847
ISSN: 0268-3768
1433-3015
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Files in This Item:
File SizeFormat 
847.pdf
  Until 2030-01-01
864.34 kBAdobe PDFView/Open
Show full item record



CORE Recommender

SCOPUSTM   
Citations

3
checked on Aug 27, 2025

WEB OF SCIENCETM
Citations

2
checked on Aug 27, 2025

Page view(s)

240
checked on Aug 25, 2025

Download(s)

10
checked on Aug 25, 2025

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.