05.09. Industrial Engineering

OrgUnit's Researchers publications
(Dept/Workgroup Publication)

Results 21-40 of 153 (Search time: 0.024 seconds).

Issue DateTitleAuthor(s)
212015Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industryKose, Simge Yelkenci; Demir, Leyla; Tunali, Semra ; Eliiyi Türsel, Deniz 
222012A CASE STUDY TO REDUCE ACCIDENT RATES AND WAITING TIMES AT A SELECTED ROUNDABOUTOner, Erdinc ; Çeli̇k, Burcu ; Isik, Gul
232007The Chlamydomonas genome reveals the evolution of key animal and plant functionsMerchant, Sabeeha S.; Prochnik, Simon E.; Vallon, Olivier; Harris, Elizabeth H.; Karpowicz, Steven J.; Witman, George B.; Terry, Astrid; Allmer, Jens 
242012Combined forecasts in portfolio optimization: A generalized approachUstun, Ozden; Kasimbeyli̇, Refail 
252013A comparison of three search algorithms for solving the buffer allocation problem in reliable production linesDemir L.; Diamantidis A.; Eliiyi Türsel, Deniz ; O'Kelly M.E.J.; Papadopoulos C.T.; Tsadiras A.K.; Tunali S. 
262011Computing efficient solutions of nonconvex multi-objective problems via scalarizationKasimbeyli R. 
272013A conic scalarization method in multi-objective optimizationKasimbeyli̇, Refail 
282012A constraint programming model for balancing and scheduling of flexible mixed model assembly lines with parallel stationsOzturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan 
292013A container storage problem in port operationsÇeli̇k, Burcu 
302016A continuous-review inventory model with disruptions and reorder pointSevgen, Arya 
312013CUMULATIVE INTERARRIVAL TIME DISTRIBUTIONS OF FREEWAY ENTRANCE RAMP TRAFFIC FOR TRAFFIC SIMULATIONSOner, Erdinc 
322013Cyclic scheduling of flexible mixed model assembly linesOzturk, Cemalettin; Tunali S. ; Hnich B.; Örnek, Mustafa Arslan 
332015Cyclic scheduling of flexible mixed model assembly lines with parallel stationsOzturk, Cemalettin; Tunali, Semra ; Hnich B.; Örnek, Mustafa Arslan 
342023A decomposition based minimax regret approach for inverse multiple criteria sorting problemÖzpeynirci, Özgür ; Özpeynirci, Selin ; Mousseau, Vincent
352023Deep Learning Enabling Digital Twin Applications in Production Scheduling: Case of Flexible Job Shop Manufacturing EnvironmentGhasemi, A.; Yeganeh, Y.T.; Matta, A.; Kabak, Kamil Erkan ; Heavey, C.
362020Design and analysis of bi-objective flexible job shop scheduling problem: A case study in construction equipment manufacturing industryResat, Hamdi Giray 
372020Design and Analysis of Novel Hybrid Multi-Objective Optimization Approach for Data-Driven Sustainable Delivery SystemsReşat, Hamdi Giray 
382020Design and development of hybrid forecasting model using artificial neural networks and ARIMA methods for sustainable energy management systems: A case study in tobacco industryResat, Hamdi Giray 
392015Determining optimum (s, S) levels of floor stock items in a paint production environmentYetkin Ekren, Banu ; Örnek, Mustafa Arslan 
402018Different methods to fuzzy X- R control charts used in production Interval type-2 fuzzy set exampleTeksen, Hatice Ercan; Anagun, Ahmet Sermet