| Issue Date | Title | Author(s) |
121 | 2008 | Optimal Berth Allocation With Variable Job Scheduling | Eliiyi Türsel, Deniz ; Korkmaz, Aslihan Gizem; Cicek, Abdullah Ercuement |
122 | 2011 | Optimality Conditions in Nonconvex Optimization Via Weak Subdifferentials | Kasimbeyli, R. ; Mammadov, M. |
123 | 2010 | Optimality Conditions Via Generalized Radial Epiderivatives in Nonconvex Set-Valued Optimization | Kasimbeyli R. ; Inceoglu G. |
124 | 2016 | Optimisation and Constraint Based Heuristic Methods for Advanced Planning and Scheduling Systems | Ozturk, Cemalettin; Örnek, Mustafa Arslan |
125 | 2016 | Optimization Approaches for Specific Airport Operations | Süğüt, İpek |
126 | 2020 | Optimizing Capacity Allocation in Semiconductor Manufacturing Photolithography Area - Case Study: Robert Bosch | Ghasemi, Amir; Azzouz, Radhia; Laipple, Georg; Kabak, Kamil Erkan ; Heavey, Cathal |
127 | 2016 | Parallel Machine Scheduling With Tool Loading | Özpeynirci, Selin ; Gokgur, Burak ; Hnich, Brahim |
148 | 2018 | Parallel Machine Scheduling With Tool Loading: a Constraint Programming Approach | Gokgur, Burak ; Hnich, Brahim; Özpeynirci, Selin |
149 | 2022 | Portfolio Decision Analysis With a Generalized Balance Approach | Özpeynirci, Selin ; Özpeynirci, Özgür ; Mousseau, Vincent |
150 | 2011 | Production Control and Stock Rationing for a Make-To System With Parallel Production Channels | Bulut, Onder; Fadiloglu, Mehmet Murat |
151 | 2010 | Production Planning and Control at an Integrated Poultry Organization | Gökçe M.A.; Gökgür, Burak ; Elverdi E.; Er E.; Gördesli T. |
152 | 2010 | The Properties of The Weak Subdifferentials | Kasimbeyli̇, Refail ; Inceoglu, Gonca |
153 | 2025 | Purchasing and Remanufacturing Decisions With Different Quality Returned Material and Finished Goods | Karabag, Oktay ; Karaesmen, Fikri; Tan, Baris |
154 | 2022 | Quantifying Return and Volatility Spillovers Among Major Cryptocurrencies: a Var-Bekk Analysis | Vardar, Gülin ; Tacoglu, Caner ; Aydogan, Berna |
155 | 2009 | Radial Epiderivatives and Set-Valued Optimization | Kasimbeyli̇, Refail |
156 | 2023 | A Reinforcement Learning Approach for Improved Photolithography Schedules | Zhang, T.; Kabak, Kamil Erkan ; Heavey, C.; Rose, O. |
157 | 2008 | A Reliability-Driven Preventive Maintenance Scheduling Problem | Eliiyi Türsel, Deniz ; Gürler S. |
18 | 2013 | Sales and Returns Forecasting for Inventory Control | Karabağ, Oktay |
19 | 2014 | A Scheduling Optimization Study in an Assembly Line of a Company in Turkey | Şerbetçioğlu, Cemre ; Ari E.; Yetkin Ekren, Banu ; Özpeynirci, Selin |
20 | 2013 | Scheduling With Tool Switching in Flexible Manufacturing Systems | Özpeynirci, Selin ; Gökgür, Burak |