Feasibility Analysis of a Photovoltaic/Battery Energy Storage Hybrid System: an Hourly Estimation Based Approach and a Real Life Case Study

Loading...
Publication Logo

Date

2017

Authors

Uctug, Fehmi Gorkem

Journal Title

Journal ISSN

Volume Title

Publisher

College Publishing

Open Access Color

HYBRID

Green Open Access

No

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Average
Influence
Average
Popularity
Average

Research Projects

Journal Issue

Abstract

This study has been undertaken to develop a consumer-oriented feasibility method for a hybrid photovoltaic (PV)-battery energy storage (BES) system by analyzing a real life house in Istanbul, Turkey, as a case study. The hourly electricity demand of the house was estimated by carrying out a detailed survey of the life style and daily habits of the household. No algorithm of any kind was used for the estimation of the energy demand with the exception of relating the lighting requirement to the daylight hours and the heating and cooling requirements to the seasonal weather changes. The developed method estimates the annual demand with an overall error of 8.68%. The net grid dependency and the feasibility of the PV-BES system was calculated for different combinations of PV and BES system sizes. It was found that when the maximum available roof area is used for PV installation and when the BES system size is increased, it is possible to achieve almost zero net grid dependency, and it is estimated that houses that are in regions with more abundant solar radiation and/ or with lower annual electricity consumption, can reach zero net grid dependency. However, the feasibility indicator, which is the payback period, turned out to be no less than 25 years in any of the scenarios. The reasons for the infeasibility are the high prices of PV and BES systems as well as the current restriction in the regulations in Turkey, which prevents BES system owners from participating in unlicensed energy generation schemes and selling excess electricity back to the grid. In order to overcome this situation, regulations should be updated to allow BES system owners to benefit from feed-in-tariff schemes, thereby increasing the popularity of both PV and BES usage in Turkey.

Description

Keywords

photovoltaics, battery energy storage systems, feasibility, Turkey, Dispatch Schedule, Battery Storage, Cost, Optimization, Generation, Buildings, Design

Fields of Science

0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology

Citation

WoS Q

Scopus Q

Q3
OpenCitations Logo
OpenCitations Citation Count
2

Source

Journal of Green Buıldıng

Volume

12

Issue

3

Start Page

54

End Page

68
PlumX Metrics
Citations

CrossRef : 2

Scopus : 2

Captures

Mendeley Readers : 12

SCOPUS™ Citations

2

checked on Mar 15, 2026

Web of Science™ Citations

2

checked on Mar 15, 2026

Page Views

5

checked on Mar 15, 2026

Downloads

6

checked on Mar 15, 2026

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
0.1433

Sustainable Development Goals

7

AFFORDABLE AND CLEAN ENERGY
AFFORDABLE AND CLEAN ENERGY Logo

9

INDUSTRY, INNOVATION AND INFRASTRUCTURE
INDUSTRY, INNOVATION AND INFRASTRUCTURE Logo