A Differential Evolution Algorithm for the Economic Lot Scheduling Problem
Loading...
Files
Date
2011
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
IEEE
Open Access Color
Green Open Access
Yes
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machine such that the production cycle of each item is an integer multiple of the basic period. The demand and the production rates are deterministic and known in advance. Our computational results suggest that our algorithm is competitive with the existing genetic algorithm, and therefore it is promising for the solution of a generalized version of the problem which is called extended basic period approach in the future.
Description
IEEE Symposium on Differential Evolution (SDE) -- APR 11-15, 2011 -- Paris, FRANCE
Keywords
Economic lot scheduling, differential evolution, heuristic optimization, Basic Period, Sizes
Fields of Science
0211 other engineering and technologies, 0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology
Citation
WoS Q
N/A
Scopus Q
N/A

OpenCitations Citation Count
4
Source
2011 Ieee Symposıum on Dıfferentıal Evolutıon (Sde)
Volume
Issue
Start Page
157
End Page
162
PlumX Metrics
Citations
CrossRef : 1
Scopus : 7
Captures
Mendeley Readers : 5
Google Scholar™


