Optimisation and Constraint Based Heuristic Methods for Advanced Planning and Scheduling Systems

dc.contributor.author Ozturk, Cemalettin
dc.contributor.author Örnek, Mustafa Arslan
dc.date.accessioned 2023-06-16T15:04:38Z
dc.date.available 2023-06-16T15:04:38Z
dc.date.issued 2016
dc.description.abstract Manufacturing Resources Planning (MRPII) systems are unable to prevent capacity problems occurring on the shop floor because of the fixed lead time and backward scheduling logic. For this reason, a new breed of concepts called APS (Advanced Planning and Scheduling) systems emerged which include finite capacity planning at the shop floor level through constraint based planning. In this paper, we present a Constraint Programming (CP) model to show how optimization models could be used in this context. We also present a two phase heuristic to solve this complicated APS problem. While jobs are assigned to the best eligible machines to smooth the workload on the machines in the first phase, a constraint based scheduling heuristic schedules jobs once they are assigned to eligible machines in the second phase. We provide numerical tests and discuss the results for both the model and the heuristic. The concluding remarks and suggestions for future research are stated in the final section of the paper. © International Journal of Industrial Engineering. en_US
dc.identifier.issn 1072-4761
dc.identifier.scopus 2-s2.0-84962204193
dc.identifier.uri https://hdl.handle.net/20.500.14365/3894
dc.language.iso en en_US
dc.publisher University of Cincinnati en_US
dc.relation.ispartof International Journal of Industrial Engineering : Theory Applications and Practice en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Advanced planning and scheduling en_US
dc.subject Constraint programming en_US
dc.subject Heuristics en_US
dc.subject Computer programming en_US
dc.subject Constraint theory en_US
dc.subject Floors en_US
dc.subject Job shop scheduling en_US
dc.subject Optimization en_US
dc.subject Phase shifters en_US
dc.subject Scheduling en_US
dc.subject Advanced planning and scheduling en_US
dc.subject Advanced planning and scheduling systems en_US
dc.subject Backward scheduling en_US
dc.subject Constraint programming en_US
dc.subject Constraint-based scheduling en_US
dc.subject Heuristics en_US
dc.subject Manufacturing resource en_US
dc.subject Optimization models en_US
dc.subject Heuristic methods en_US
dc.title Optimisation and Constraint Based Heuristic Methods for Advanced Planning and Scheduling Systems en_US
dc.type Article en_US
dspace.entity.type Publication
gdc.author.scopusid 35093153800
gdc.coar.access metadata only access
gdc.coar.type text::journal::journal article
gdc.description.departmenttemp Ozturk, C., Insight Centre for Data Analytics, University College Cork, Cork, Ireland; Ornek, M.A., Department of Industrial Engineering, Izmir University of Economics, Izmir, Turkey en_US
gdc.description.endpage 48 en_US
gdc.description.issue 1 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q3
gdc.description.startpage 26 en_US
gdc.description.volume 23 en_US
gdc.description.wosquality Q4
gdc.identifier.wos WOS:000373358500003
gdc.index.type WoS
gdc.index.type Scopus
gdc.scopus.citedcount 19
gdc.virtual.author Örnek, Mustafa Arslan
gdc.wos.citedcount 16
relation.isAuthorOfPublication d2060c9c-5bfd-4820-b937-50e6621af9e1
relation.isAuthorOfPublication.latestForDiscovery d2060c9c-5bfd-4820-b937-50e6621af9e1
relation.isOrgUnitOfPublication bdb88a44-c66f-45fd-b2ec-de89cb1c93a0
relation.isOrgUnitOfPublication 26a7372c-1a5e-42d9-90b6-a3f7d14cad44
relation.isOrgUnitOfPublication e9e77e3e-bc94-40a7-9b24-b807b2cd0319
relation.isOrgUnitOfPublication.latestForDiscovery bdb88a44-c66f-45fd-b2ec-de89cb1c93a0

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
2947.pdf
Size:
483.22 KB
Format:
Adobe Portable Document Format