Operational Extended Model Formulations for Advanced Planning and Scheduling Systems
| dc.contributor.author | Ozturk, Cemalettin | |
| dc.contributor.author | Örnek, Mustafa Arslan | |
| dc.date.accessioned | 2023-06-16T12:58:54Z | |
| dc.date.available | 2023-06-16T12:58:54Z | |
| dc.date.issued | 2014 | |
| dc.description.abstract | Since the basic reasoning of Manufacturing Resources Planning (MRPII) systems is flawed, a new breed of concepts called Advanced Planning and Scheduling systems CAPS) have recently emerged to overcome the problems occurring on the shop floor. In this study, we develop improved and extended mixed integer programming formulations for APS systems at the factory planning level. First, we develop a basic model which explicitly considers capacity constraints, operation sequences, processing times, and due dates in a multi-machine, multi-order, multi-item environment where an item can be processed on a given set of eligible machines. The extensions to the basic model include sequence dependent setups, and transfer times between machines. We also show that our model with a little modification could be used to quote delivery times for customer orders in case due dates are not specified. We provide numerical examples and our conclusions along with future research directions. (C) 2013 Elsevier Inc. All rights reserved. | en_US |
| dc.identifier.doi | 10.1016/j.apm.2013.05.049 | |
| dc.identifier.issn | 0307-904X | |
| dc.identifier.issn | 1872-8480 | |
| dc.identifier.scopus | 2-s2.0-84887623374 | |
| dc.identifier.uri | https://doi.org/10.1016/j.apm.2013.05.049 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14365/1063 | |
| dc.language.iso | en | en_US |
| dc.publisher | Elsevier Science Inc | en_US |
| dc.relation.ispartof | Applıed Mathematıcal Modellıng | en_US |
| dc.rights | info:eu-repo/semantics/openAccess | en_US |
| dc.subject | Scheduling | en_US |
| dc.subject | MRP | en_US |
| dc.subject | Advanced Planning and Scheduling | en_US |
| dc.subject | Mixed integer programming | en_US |
| dc.subject | Integer Programming-Model | en_US |
| dc.subject | Constraints | en_US |
| dc.title | Operational Extended Model Formulations for Advanced Planning and Scheduling Systems | en_US |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.id | Ornek, M Arslan/0000-0002-8612-5183 | |
| gdc.author.id | Ozturk, Cemalettin/0000-0001-5190-9319 | |
| gdc.author.scopusid | 35093153800 | |
| gdc.author.scopusid | 55926629500 | |
| gdc.author.wosid | Ornek, M Arslan/A-5643-2009 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C4 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | open access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | İzmir Ekonomi Üniversitesi | en_US |
| gdc.description.departmenttemp | [Ozturk, Cemalettin; Ornek, Arslan M.] Izmir Univ Econ, Dept Ind Engn, TR-35330 Izmir, Turkey | en_US |
| gdc.description.endpage | 195 | en_US |
| gdc.description.issue | 1 | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q1 | |
| gdc.description.startpage | 181 | en_US |
| gdc.description.volume | 38 | en_US |
| gdc.description.wosquality | Q1 | |
| gdc.identifier.openalex | W2069656608 | |
| gdc.identifier.wos | WOS:000330490500013 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.accesstype | HYBRID | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 3.0 | |
| gdc.oaire.influence | 3.3469065E-9 | |
| gdc.oaire.isgreen | false | |
| gdc.oaire.keywords | Deterministic scheduling theory in operations research | |
| gdc.oaire.keywords | Mixed integer programming | |
| gdc.oaire.keywords | MRP | |
| gdc.oaire.keywords | scheduling | |
| gdc.oaire.keywords | Production models | |
| gdc.oaire.keywords | advanced planning and scheduling | |
| gdc.oaire.keywords | mixed integer programming | |
| gdc.oaire.popularity | 7.299629E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0209 industrial biotechnology | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 3.4853 | |
| gdc.openalex.normalizedpercentile | 0.92 | |
| gdc.openalex.toppercent | TOP 10% | |
| gdc.opencitations.count | 12 | |
| gdc.plumx.crossrefcites | 4 | |
| gdc.plumx.mendeley | 67 | |
| gdc.plumx.scopuscites | 17 | |
| gdc.scopus.citedcount | 17 | |
| gdc.virtual.author | Örnek, Mustafa Arslan | |
| gdc.wos.citedcount | 13 | |
| relation.isAuthorOfPublication | d2060c9c-5bfd-4820-b937-50e6621af9e1 | |
| relation.isAuthorOfPublication.latestForDiscovery | d2060c9c-5bfd-4820-b937-50e6621af9e1 | |
| relation.isOrgUnitOfPublication | bdb88a44-c66f-45fd-b2ec-de89cb1c93a0 | |
| relation.isOrgUnitOfPublication | 26a7372c-1a5e-42d9-90b6-a3f7d14cad44 | |
| relation.isOrgUnitOfPublication | e9e77e3e-bc94-40a7-9b24-b807b2cd0319 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | bdb88a44-c66f-45fd-b2ec-de89cb1c93a0 |
Files
Original bundle
1 - 1 of 1
