Computing the Non-Stationary Replenishment Cycle Inventory Policy Under Stochastic Supplier Lead-Times
| dc.contributor.author | Rossi, Roberto | |
| dc.contributor.author | Tarim, S. Armagan | |
| dc.contributor.author | Hnich, Brahim | |
| dc.contributor.author | Prestwich, Steven | |
| dc.date.accessioned | 2023-06-16T12:59:34Z | |
| dc.date.available | 2023-06-16T12:59:34Z | |
| dc.date.issued | 2010-09 | |
| dc.description.abstract | In this paper we address the general multi-period production/inventory problem with non-stationary stochastic demand and supplier lead-time under service level constraints. A replenishment cycle policy (RS) is modeled, where R is the nth replenishment cycle length and S is the respective order-up-to-level. We propose a stochastic constraint programming approach for computing the optimal policy parameters. In order to do so, a dedicated global chance-constraint and the respective filtering algorithm that enforce the required service level are presented. Our numerical examples show that a stochastic supplier lead-time significantly affects policy parameters with respect to the case in which the lead-time is assumed to be deterministic or absent. (C) 2010 Elsevier B.V. All rights reserved. | en_US |
| dc.description.sponsorship | European Community [244994]; Hacettepe University-BAB; Scientific and Technological Research Council of Turkey (TUBITAK) [SOBAG-108K027] | en_US |
| dc.description.sponsorship | This author has received funding from the European Community's Seventh Framework Programme (FP7) under grant agreement no 244994 (project VEG-i-TRADE).; This author is supported by Hacettepe University-BAB.; The author is supported by the Scientific and Technological Research Council of Turkey (TUBITAK) under Grant No. SOBAG-108K027 | en_US |
| dc.identifier.doi | 10.1016/j.ijpe.2010.05.011 | |
| dc.identifier.issn | 0925-5273 | |
| dc.identifier.issn | 1873-7579 | |
| dc.identifier.scopus | 2-s2.0-77955472084 | |
| dc.identifier.uri | https://doi.org/10.1016/j.ijpe.2010.05.011 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14365/1247 | |
| dc.language.iso | en | en_US |
| dc.publisher | Elsevier | en_US |
| dc.relation.ispartof | Internatıonal Journal of Productıon Economıcs | en_US |
| dc.rights | info:eu-repo/semantics/openAccess | en_US |
| dc.subject | Inventory control | en_US |
| dc.subject | Demand uncertainty | en_US |
| dc.subject | Supplier lead-time uncertainty | en_US |
| dc.subject | Stochastic constraint programming | en_US |
| dc.subject | Global chance-constraints | en_US |
| dc.subject | Lot-Sizing Problem | en_US |
| dc.subject | Constraint | en_US |
| dc.subject | Systems | en_US |
| dc.subject | Model | en_US |
| dc.title | Computing the Non-Stationary Replenishment Cycle Inventory Policy Under Stochastic Supplier Lead-Times | en_US |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.id | Rossi, Roberto/0000-0001-7247-1010 | |
| gdc.author.id | Tarim, S. Armagan/0000-0001-5601-3968 | |
| gdc.author.id | Hnich, Brahim/0000-0001-8875-8390 | |
| gdc.author.id | Prestwich, Steven/0000-0002-6218-9158 | |
| gdc.author.scopusid | 35563636800 | |
| gdc.author.scopusid | 6506794189 | |
| gdc.author.scopusid | 6602458958 | |
| gdc.author.scopusid | 7004234709 | |
| gdc.author.wosid | Rossi, Roberto/B-4397-2010 | |
| gdc.author.wosid | Tarim, S. Armagan/B-4414-2010 | |
| gdc.bip.impulseclass | C4 | |
| gdc.bip.influenceclass | C4 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | open access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | İzmir Ekonomi Üniversitesi | en_US |
| gdc.description.departmenttemp | [Rossi, Roberto] Wageningen UR, NL-6706 KN Wageningen, Netherlands; [Tarim, S. Armagan] Hacettepe Univ, Dept Management, Ankara, Turkey; [Hnich, Brahim] Izmir Univ Econ, Fac Comp Sci, Izmir, Turkey; [Prestwich, Steven] Natl Univ Ireland Univ Coll Cork, Cork Constraint Computat Ctr, Cork, Ireland | en_US |
| gdc.description.endpage | 189 | en_US |
| gdc.description.issue | 1 | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q1 | |
| gdc.description.startpage | 180 | en_US |
| gdc.description.volume | 127 | en_US |
| gdc.description.wosquality | Q1 | |
| gdc.identifier.openalex | W2153714619 | |
| gdc.identifier.wos | WOS:000281345300018 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.accesstype | BRONZE | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.downloads | 2 | |
| gdc.oaire.impulse | 12.0 | |
| gdc.oaire.influence | 4.8193414E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | /dk/atira/pure/subjectarea/asjc/2000/2002 | |
| gdc.oaire.keywords | Economics and Econometrics | |
| gdc.oaire.keywords | model | |
| gdc.oaire.keywords | Stochastic constraint programming | |
| gdc.oaire.keywords | Business, Management and Accounting(all) | |
| gdc.oaire.keywords | /dk/atira/pure/subjectarea/asjc/2200/2209 | |
| gdc.oaire.keywords | demand | |
| gdc.oaire.keywords | Management Science and Operations Research | |
| gdc.oaire.keywords | Supplier lead-time uncertainty | |
| gdc.oaire.keywords | Industrial and Manufacturing Engineering | |
| gdc.oaire.keywords | Demand uncertainty | |
| gdc.oaire.keywords | /dk/atira/pure/subjectarea/asjc/1400 | |
| gdc.oaire.keywords | lot-sizing problem | |
| gdc.oaire.keywords | service-level constraints | |
| gdc.oaire.keywords | systems | |
| gdc.oaire.keywords | /dk/atira/pure/subjectarea/asjc/1800/1803 | |
| gdc.oaire.keywords | Global chance-constraints | |
| gdc.oaire.keywords | Inventory control | |
| gdc.oaire.popularity | 5.0691122E-9 | |
| gdc.oaire.publicfunded | true | |
| gdc.oaire.sciencefields | 0209 industrial biotechnology | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.oaire.views | 2 | |
| gdc.openalex.collaboration | International | |
| gdc.openalex.fwci | 8.4196 | |
| gdc.openalex.normalizedpercentile | 0.97 | |
| gdc.openalex.toppercent | TOP 10% | |
| gdc.opencitations.count | 30 | |
| gdc.plumx.crossrefcites | 23 | |
| gdc.plumx.mendeley | 30 | |
| gdc.plumx.scopuscites | 33 | |
| gdc.scopus.citedcount | 33 | |
| gdc.wos.citedcount | 27 | |
| relation.isOrgUnitOfPublication | e9e77e3e-bc94-40a7-9b24-b807b2cd0319 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | e9e77e3e-bc94-40a7-9b24-b807b2cd0319 |
Files
Original bundle
1 - 1 of 1
