Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Parallel Stations
| dc.contributor.author | Ozturk, Cemalettin | |
| dc.contributor.author | Tunali, Semra | |
| dc.contributor.author | Hnich B. | |
| dc.contributor.author | Örnek, Mustafa Arslan | |
| dc.date.accessioned | 2023-06-16T12:47:42Z | |
| dc.date.available | 2023-06-16T12:47:42Z | |
| dc.date.issued | 2013 | |
| dc.description.abstract | In this paper, we study flexible mixed model assembly lines with serially connected stages where stages may have one or more parallel stations. Station parallelism in flexible mixed model assembly lines improves system reliability and enables rapid adaptability to customer demand fluctuations. However, in order to effectively manage such lines under real-world conditions, there is a need to extend traditional assembly line management methods. This study extends the current research by simultaneously considering the problems of task assignment and model scheduling on parallel stations. Furthermore, scheduling of assigned tasks on each station is considered. We formulate the problem context first as a mixed integer programming model and then develop a decomposition scheme for large scale applications. Finally, we compare the performance of the proposed model and decomposition scheme using various size test instances. | en_US |
| dc.identifier.doi | 10.1007/s00170-012-4675-1 | |
| dc.identifier.issn | 0268-3768 | |
| dc.identifier.issn | 1433-3015 | |
| dc.identifier.scopus | 2-s2.0-84891491401 | |
| dc.identifier.uri | https://doi.org/10.1007/s00170-012-4675-1 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14365/844 | |
| dc.language.iso | en | en_US |
| dc.publisher | Springer London Ltd | en_US |
| dc.relation.ispartof | Internatıonal Journal of Advanced Manufacturıng Technology | en_US |
| dc.rights | info:eu-repo/semantics/closedAccess | en_US |
| dc.subject | Mixed model assembly lines | en_US |
| dc.subject | Balancing | en_US |
| dc.subject | Scheduling | en_US |
| dc.subject | Flexible manufacturing | en_US |
| dc.subject | Mixed integer programming | en_US |
| dc.subject | System | en_US |
| dc.subject | Algorithms | en_US |
| dc.subject | Design | en_US |
| dc.title | Balancing and Scheduling of Flexible Mixed Model Assembly Lines With Parallel Stations | en_US |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.id | Ornek, M Arslan/0000-0002-8612-5183 | |
| gdc.author.id | Hnich, Brahim/0000-0001-8875-8390 | |
| gdc.author.id | Ozturk, Cemalettin/0000-0001-5190-9319 | |
| gdc.author.scopusid | 35093153800 | |
| gdc.author.scopusid | 7004191746 | |
| gdc.author.scopusid | 6602458958 | |
| gdc.author.scopusid | 55926629500 | |
| gdc.author.wosid | Ornek, M Arslan/A-5643-2009 | |
| gdc.author.wosid | tunali, semra/AAM-5058-2021 | |
| gdc.bip.impulseclass | C4 | |
| gdc.bip.influenceclass | C4 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | metadata only access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | İzmir Ekonomi Üniversitesi | en_US |
| gdc.description.departmenttemp | [Ozturk, Cemalettin; Ornek, Arslan] Izmir Univ Econ, Dept Ind Syst Engn, Izmir, Turkey; [Tunali, Semra] Izmir Univ Econ, Dept Business Adm, Izmir, Turkey; [Hnich, Brahim] Izmir Univ Econ, Dept Comp Engn, Izmir, Turkey | en_US |
| gdc.description.endpage | 2591 | en_US |
| gdc.description.issue | 9.Ara | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q2 | |
| gdc.description.startpage | 2577 | en_US |
| gdc.description.volume | 67 | en_US |
| gdc.description.wosquality | Q2 | |
| gdc.identifier.openalex | W2024643250 | |
| gdc.identifier.wos | WOS:000322326300051 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 6.0 | |
| gdc.oaire.influence | 4.035506E-9 | |
| gdc.oaire.isgreen | false | |
| gdc.oaire.popularity | 1.0049303E-8 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0209 industrial biotechnology | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 7.5328 | |
| gdc.openalex.normalizedpercentile | 0.97 | |
| gdc.openalex.toppercent | TOP 10% | |
| gdc.opencitations.count | 20 | |
| gdc.plumx.crossrefcites | 9 | |
| gdc.plumx.mendeley | 40 | |
| gdc.plumx.scopuscites | 24 | |
| gdc.scopus.citedcount | 24 | |
| gdc.virtual.author | Tunalı, Semra | |
| gdc.virtual.author | Örnek, Mustafa Arslan | |
| gdc.wos.citedcount | 19 | |
| relation.isAuthorOfPublication | e53c0447-6e83-45f5-91d8-87bff8b0ed82 | |
| relation.isAuthorOfPublication | d2060c9c-5bfd-4820-b937-50e6621af9e1 | |
| relation.isAuthorOfPublication.latestForDiscovery | e53c0447-6e83-45f5-91d8-87bff8b0ed82 | |
| relation.isOrgUnitOfPublication | bdb88a44-c66f-45fd-b2ec-de89cb1c93a0 | |
| relation.isOrgUnitOfPublication | 7946402e-adc8-4c62-ac59-fbb13820ac91 | |
| relation.isOrgUnitOfPublication | 26a7372c-1a5e-42d9-90b6-a3f7d14cad44 | |
| relation.isOrgUnitOfPublication | d61c5ef4-1ebc-4355-bc4f-dfa76978271b | |
| relation.isOrgUnitOfPublication | e9e77e3e-bc94-40a7-9b24-b807b2cd0319 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | bdb88a44-c66f-45fd-b2ec-de89cb1c93a0 |
Files
Original bundle
1 - 1 of 1
