A Hybrid Reliability Model for Imperfect Preventive Maintenance Planning
Loading...
Files
Date
2010
Authors
Eliiyi Türsel, Deniz
Journal Title
Journal ISSN
Volume Title
Publisher
Vilnius Gediminas Technical University
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
In this study, we consider preventive maintenance planning for a component subject to failure. While earlier studies in literature consider the problem using failure rate, reliability is used in this study. Whenever the component's reliability falls below the reliability threshold R, an imperfect preventive maintenance is performed, which causes more frequent preventive maintenance over time. We use a hybrid reliability approach for modeling the effect of imperfect maintenance. We model total expected cost over all cycles, which can be used in making the optimal preventive maintenance plan. © Izmir University of Economics, Turkey, 2010.
Description
24th Mini EURO Conference on Continuous Optimization and Information-Based Technologies in the Financial Sector, MEC EurOPT 2010 -- 23 June 2010 through 26 June 2010 -- Izmir -- 106702
Keywords
Failure rate, Preventive maintenance, Reliability, Failure analysis, Optimization, Planning, Reliability, Failure rate, Hybrid reliability models, Imperfect maintenance, Imperfect preventive maintenance, Optimal preventive maintenance, Preventive maintenance planning, Reliability threshold, Total expected costs, Preventive maintenance
Fields of Science
Citation
WoS Q
N/A
Scopus Q
N/A
Source
24th Mini EURO Conference on Continuous Optimization and Information-Based Technologies in the Financial Sector, MEC EurOPT 2010
Volume
Issue
Start Page
213
End Page
219
