How Realistic Are Coal Phase-Out Timeline Targets for Turkey?
| dc.contributor.author | Uyanık, Sırrı | |
| dc.contributor.author | Döğerlioğlu Işıksungur, Özlem | |
| dc.date.accessioned | 2024-03-30T11:20:48Z | |
| dc.date.available | 2024-03-30T11:20:48Z | |
| dc.date.issued | 2024 | |
| dc.description.abstract | Coal phase-out is considered to be critical to the success of energy transition for all countries. Yet, recent assessments indicate that energy security aspects may affect phase-out plans and/or commitments and jeopardize energy transition ambitions. This study aims to question to what extent coal phase-out targets for Turkiye are realistic. Although previous research has mainly focused on direct emission reduction targets and just transition aspects, we include a down-to-earth discussion of the potential challenges before coal phase-out. The interaction between phasing-out coal power generation and energy security aspects is also analyzed. To understand the coal phase-out timeline targets, its limitations, and constraints within the framework of future power projections, a supply-demand model with different scenarios was developed. In addition, energy storage was also discussed as an option. Analysis revealed that energy storage, in the short- and medium-term, may not be the panacea, as it may not be deployed in the scale to substitute the energy security that coal provided. Moreover, our findings indicate that phasing-out is not as simple as assumed. A target timeline is certainly not realistic considering the energy security aspect and challenges. On the other hand, economically nonviable and technically nonavailable coal-fired power plants in the power system may retire gradually (as a natural phase-out process). This may occur even without waiting for the target timeline, if there would ever officially be one. | en_US |
| dc.identifier.doi | 10.3390/su16041649 | |
| dc.identifier.issn | 2071-1050 | |
| dc.identifier.scopus | 2-s2.0-85186125490 | |
| dc.identifier.uri | https://doi.org/10.3390/su16041649 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14365/5198 | |
| dc.language.iso | en | en_US |
| dc.publisher | MDPI | en_US |
| dc.relation.ispartof | Sustainability | en_US |
| dc.rights | info:eu-repo/semantics/closedAccess | en_US |
| dc.subject | energy security | en_US |
| dc.subject | coal-fired power generation | en_US |
| dc.subject | variable renewable energy | en_US |
| dc.subject | coal phase-out | en_US |
| dc.subject | coal exit | en_US |
| dc.subject | energy storage | en_US |
| dc.subject | Renewable Energy | en_US |
| dc.title | How Realistic Are Coal Phase-Out Timeline Targets for Turkey? | en_US |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.institutional | … | |
| gdc.author.scopusid | 57195237487 | |
| gdc.author.scopusid | 58908881800 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C5 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | metadata only access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | İzmir Ekonomi Üniversitesi | en_US |
| gdc.description.departmenttemp | [Uyanik, Sirri] KTO Karatay Univ, Fac Econ & Management, TR-42020 Konya, Turkiye; [Dogerlioglu Isiksungur, Ozlem] Izmir Univ Econ, Fac Law, TR-35330 Izmir, Turkiye | en_US |
| gdc.description.issue | 4 | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q2 | |
| gdc.description.volume | 16 | en_US |
| gdc.description.wosquality | Q2 | |
| gdc.identifier.openalex | W4391927810 | |
| gdc.identifier.wos | WOS:001172184700001 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.accesstype | GOLD | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 3.0 | |
| gdc.oaire.influence | 2.635692E-9 | |
| gdc.oaire.isgreen | false | |
| gdc.oaire.keywords | Coal Exit | |
| gdc.oaire.keywords | Renewable Energy | |
| gdc.oaire.keywords | Energy Storage | |
| gdc.oaire.keywords | Energy Security | |
| gdc.oaire.keywords | Coal-Fired Power Generation | |
| gdc.oaire.keywords | Variable Renewable Energy | |
| gdc.oaire.keywords | Coal Phase-Out | |
| gdc.oaire.popularity | 4.669089E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 0202 electrical engineering, electronic engineering, information engineering | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 1.3025 | |
| gdc.openalex.normalizedpercentile | 0.79 | |
| gdc.opencitations.count | 2 | |
| gdc.plumx.mendeley | 17 | |
| gdc.plumx.scopuscites | 3 | |
| gdc.scopus.citedcount | 3 | |
| gdc.virtual.author | Döğerlioğlu Işıksungur, Özlem | |
| gdc.wos.citedcount | 3 | |
| relation.isAuthorOfPublication | cbb1ac63-835e-470b-a9ae-f16b564b7394 | |
| relation.isAuthorOfPublication.latestForDiscovery | cbb1ac63-835e-470b-a9ae-f16b564b7394 | |
| relation.isOrgUnitOfPublication | 2a6542d5-9871-4850-bedd-4f2433f28d71 | |
| relation.isOrgUnitOfPublication | 6a141847-f4d0-4194-ab76-e0c17a6d2a34 | |
| relation.isOrgUnitOfPublication | e9e77e3e-bc94-40a7-9b24-b807b2cd0319 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 2a6542d5-9871-4850-bedd-4f2433f28d71 |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- HowRealistic.pdf
- Size:
- 3.23 MB
- Format:
- Adobe Portable Document Format