Parallel Machine Scheduling With Tool Loading
Loading...
Files
Date
2016
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Elsevier Science Inc
Open Access Color
HYBRID
Green Open Access
Yes
OpenAIRE Downloads
1
OpenAIRE Views
3
Publicly Funded
No
Abstract
This paper presents a mixed integer programming approach that integrates the tool assignment and scheduling problems arising in parallel machine environments. There are a number of operations to be processed on parallel machines. Each operation requires a set of tools; however, the number of available tools are limited. Our objective is to minimize the makespan, i.e. the completion time of the final operation. We propose two different mathematical programming models for this problem. Since the problem is strongly NP hard in general, finding the optimal solution requires extremely long computational times as the problem size increases. We therefore develop a tabu search algorithm in order to find near-optimal solutions within reasonable times. (C) 2016 Elsevier Inc. All rights reserved.
Description
Keywords
Parallel machines, Scheduling, Tool assignment, Mixed integer programming, Tabu search, Flexible Manufacturing Systems, Due-Date, Models, Formulations, Deterministic scheduling theory in operations research, Mixed integer programming, parallel machines, tool assignment, tabu search, scheduling, mixed integer programming
Fields of Science
0211 other engineering and technologies, 02 engineering and technology
Citation
WoS Q
Q1
Scopus Q
Q1

OpenCitations Citation Count
35
Source
Applıed Mathematıcal Modellıng
Volume
40
Issue
9.Eki
Start Page
5660
End Page
5671
PlumX Metrics
Citations
CrossRef : 10
Scopus : 41
Captures
Mendeley Readers : 40
SCOPUS™ Citations
41
checked on Mar 20, 2026
Web of Science™ Citations
37
checked on Mar 20, 2026
Page Views
6
checked on Mar 20, 2026
Downloads
13
checked on Mar 20, 2026
Google Scholar™


