Simultaneous Allocation of Continuous Berths and Mobile Cranes With Variable Handling Times
Loading...
Files
Date
2008
Authors
Eliiyi Türsel, Deniz
Ada, Erhan
Sevil, Bengue
Yumurtacı Hüseyinoğlu, Işık Özge
Journal Title
Journal ISSN
Volume Title
Publisher
Vilnius Gediminas Technical Univ Press, Technika
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
Port management is a strategic issue for the developing economies. Its activities directly influence the trade volume of the region where the port is located, increase the investment in the region, and contribute to the overall economic development. There are many activities and decisions to be arranged and managed in a port. In this paper, one of the most important port management activities, Berth Allocation Problem, is studied in detail, to reduce congestion in the port. The contribution of the study is based on simultaneous allocation of continuous berths and mobile cranes. The approach is applied to the Port of Izmir and promising preliminary results of our study are presented.
Description
20th International Conference/Euro Mini Conference on Continuous Optimization and Knowledge-Based Technologies (EurOPT 2008) -- MAY 20-23, 2008 -- Neringa, LITHUANIA
ORCID
Keywords
berth allocation problem, crane allocation problem, port of izmir, port management, non linear programming, Container Port, Models
Fields of Science
Citation
WoS Q
N/A
Scopus Q
N/A
Source
20Th Internatıonal Conference, Euro Mını Conference Contınuous Optımızatıon And Knowledge-Based Technologıes, Europt'2008
Volume
Issue
Start Page
364
End Page
369
Page Views
4
checked on Mar 15, 2026
