Scheduling With Tool Switching in Flexible Manufacturing Systems

Loading...
Publication Logo

Date

2013

Authors

Özpeynirci, Selin
Gökgür, Burak

Journal Title

Journal ISSN

Volume Title

Publisher

Open Access Color

OpenAIRE Downloads

OpenAIRE Views

Research Projects

Journal Issue

Abstract

In our problem, there are a number of jobs to be processed on parallel computer numerically controlled machines. Each job requires a set of tools and the required tools must be loaded to process the jobs. The machines have limited tool magazine capacities and the number of tools available in the system is limited due to economic restrictions, which leads to the need for switching tools. We assume that the tool switching time constitutes a significant portion of total processing time and does not depend on the number or type of tools changed. The problem is to assign the jobs and the required tools to machines and determine the schedule so that the makespan is minimized. A mathematical model and a heuristic approach based on the decomposition of the problem are developed.

Description

Inst. Syst. Technol. Inf., Control Commun. (INSTICC)
2nd International Conference on Operations Research and Enterprise Systems, ICORES 2013 -- 16 February 2013 through 18 February 2013 -- Barcelona -- 97006

Keywords

Flexible manufacturing systems, Mathematical modelling, Scheduling, Tool switching, Heuristic approach, Makespan, Parallel computer, Tool magazine, Tool switching, Total processing time, Flexible manufacturing systems, Heuristic methods, Mathematical models, Operations research, Scheduling, Scheduling algorithms, Switching

Fields of Science

Citation

WoS Q

N/A

Scopus Q

N/A

Source

ICORES 2013 - Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems

Volume

Issue

Start Page

326

End Page

329
Google Scholar Logo
Google Scholar™

Sustainable Development Goals

INDUSTRY, INNOVATION AND INFRASTRUCTURE9
INDUSTRY, INNOVATION AND INFRASTRUCTURE