Scheduling With Tool Switching in Flexible Manufacturing Systems

dc.contributor.author Özpeynirci, Selin
dc.contributor.author Gökgür, Burak
dc.date.accessioned 2023-06-16T15:06:33Z
dc.date.available 2023-06-16T15:06:33Z
dc.date.issued 2013
dc.description Inst. Syst. Technol. Inf., Control Commun. (INSTICC) en_US
dc.description 2nd International Conference on Operations Research and Enterprise Systems, ICORES 2013 -- 16 February 2013 through 18 February 2013 -- Barcelona -- 97006 en_US
dc.description.abstract In our problem, there are a number of jobs to be processed on parallel computer numerically controlled machines. Each job requires a set of tools and the required tools must be loaded to process the jobs. The machines have limited tool magazine capacities and the number of tools available in the system is limited due to economic restrictions, which leads to the need for switching tools. We assume that the tool switching time constitutes a significant portion of total processing time and does not depend on the number or type of tools changed. The problem is to assign the jobs and the required tools to machines and determine the schedule so that the makespan is minimized. A mathematical model and a heuristic approach based on the decomposition of the problem are developed. en_US
dc.identifier.isbn 9.79E+12
dc.identifier.scopus 2-s2.0-84877975127
dc.identifier.uri https://hdl.handle.net/20.500.14365/3983
dc.language.iso en en_US
dc.relation.ispartof ICORES 2013 - Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Flexible manufacturing systems en_US
dc.subject Mathematical modelling en_US
dc.subject Scheduling en_US
dc.subject Tool switching en_US
dc.subject Heuristic approach en_US
dc.subject Makespan en_US
dc.subject Parallel computer en_US
dc.subject Tool magazine en_US
dc.subject Tool switching en_US
dc.subject Total processing time en_US
dc.subject Flexible manufacturing systems en_US
dc.subject Heuristic methods en_US
dc.subject Mathematical models en_US
dc.subject Operations research en_US
dc.subject Scheduling en_US
dc.subject Scheduling algorithms en_US
dc.subject Switching en_US
dc.title Scheduling With Tool Switching in Flexible Manufacturing Systems en_US
dc.type Conference Object en_US
dspace.entity.type Publication
gdc.author.scopusid 25228157500
gdc.coar.access metadata only access
gdc.coar.type text::conference output
gdc.description.departmenttemp Özpeynirci, S., Department of Industrial Systems Engineering, Izmir University of Economics, Sakarya Cad. No 156, Izmir, Turkey; Gökgür, B., Department of Industrial Systems Engineering, Izmir University of Economics, Sakarya Cad. No 156, Izmir, Turkey en_US
gdc.description.endpage 329 en_US
gdc.description.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality N/A
gdc.description.startpage 326 en_US
gdc.description.wosquality N/A
gdc.index.type Scopus
gdc.scopus.citedcount 0
gdc.virtual.author Gökgür, Burak
gdc.virtual.author Özpeynirci, Selin
relation.isAuthorOfPublication 9c759936-f288-4ae5-8aef-683712c763af
relation.isAuthorOfPublication d82ff079-0740-4ceb-ab89-52b2b2cf2bc4
relation.isAuthorOfPublication.latestForDiscovery 9c759936-f288-4ae5-8aef-683712c763af
relation.isOrgUnitOfPublication bdb88a44-c66f-45fd-b2ec-de89cb1c93a0
relation.isOrgUnitOfPublication 26a7372c-1a5e-42d9-90b6-a3f7d14cad44
relation.isOrgUnitOfPublication e9e77e3e-bc94-40a7-9b24-b807b2cd0319
relation.isOrgUnitOfPublication.latestForDiscovery bdb88a44-c66f-45fd-b2ec-de89cb1c93a0

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
3008.pdf
Size:
296.49 KB
Format:
Adobe Portable Document Format